Specifications
Brand Name :
TOBO
Model Number :
Pipe Fittings
Certification :
ISO
Place of Origin :
CHINA
MOQ :
1PCS
Price :
negotiable
Payment Terms :
L/C, D/A, D/P, T/T, Western Union
Supply Ability :
1000000 Piece/Pieces per Month
Delivery Time :
25workdays
Packaging Details :
Wooden case
Application :
Petroleum, Chemical, Power, Gas, Metallurgy, Shipbuilding, Construction
Certificate :
ISO, API, CE, BV, SGS, IBR, etc.
Connection :
Butt Weld
Material :
Carbon Steel, Stainless Steel
Origin :
China
Package :
Wooden Cases, Wooden Pallet Plastic Bag
Payment Term :
T/T, L/C, Western Union, PayPal
Pressure :
3000LB, 6000LB, 9000LB
Size :
1/2”-72”
Standard :
ASME B16.9, ASME B16.25, MSS SP-43, MSS SP-75
Surface Treatment :
Black Painting, Anti-rust Oil, Hot Galvanized, Cold Galvanized
Trademark :
Shengtian
Wall Thickness :
SCH5S-SCH160, XS, XXS, STD
Description

Butt Weld Fitting Stainless Steel Concentric /Eccentric reducer 4'' Pipepipe fittings

Product Description
Size
1/2"-24" seamless,26“-110”welded
Standard
ANSI B16.9,MSS SP 43, DIN2615, EN10253, GOST17376, JIS B2313, MSS SP 75, etc.
Wall thickness
STD, XS, XXS, SCH20,SCH30,SCH40, SCH60, SCH80, SCH160, XXS and etc.
Type
Equal/Straight tee,reduced tee,Y tee,lateral tee,Barred tee,split tee,tee cross
End
bevel end/BE/buttweld
Surface
nature color, varnished, black painting, anti-rust oil etc.
Material
Alloy steel: Inconel 718 alloy,Inconel 625alloy,Inconel 825 alloy
Pipeline steel: WPHY42, WPHY52, WPHY60, WPHY65,WPHY70, WPHY80 and etc.
Cr-Mo allo steel: P11,P22,P5, P9,P91, 10CrMo9-10, 16Mo3 etc.
Application
Petrochemical industy;avation and aerospace industry;pharmaceutical industry;gas exhaust;
power plart; ship buliding;water treament,etc.
Advantages
ready stock,faster delivery time;available in all sizes,austomized;high quality

Butt Weld Fitting Stainless Steel Concentric /Eccentric reducer 4''   Pipepipe fittingsButt Weld Fitting Stainless Steel Concentric /Eccentric reducer 4''   Pipepipe fittingsButt Weld Fitting Stainless Steel Concentric /Eccentric reducer 4''   Pipepipe fittings

Recommend Products
FAQ
FAQ
Q 1. What's the payment term?
A: We accept T/T 30% deposit and 70% balance against copy of B/L or L/C at sight, West Union,VISA,Paypal is also accepted.

Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10
days, average production time after sample approval is 2-3 weeks.

Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.

Q 4. Could you please tell us the month capacity of your products ?
A: It depends on which model, we produce more than 2500 tons rubber materials per month.

Q 5. what kind of certificates you have?
A1: We have been ISO9001:2008 and ISO14001:2004 certified by SGS since 2005.
A2: We have various rubber compounds approved by UL, FDA, NSF, KTW, W270, WRAS, ACS, AS4020, EN681, EN549, ROHS and REACH.
Send your message to this supplier
Send Now

Butt Weld Fitting Stainless Steel Concentric /Eccentric reducer 4'' Pipepipe fittings

Ask Latest Price
Watch Video
Brand Name :
TOBO
Model Number :
Pipe Fittings
Certification :
ISO
Place of Origin :
CHINA
MOQ :
1PCS
Price :
negotiable
Contact Supplier
video
Butt Weld Fitting Stainless Steel Concentric /Eccentric reducer 4''   Pipepipe fittings
Butt Weld Fitting Stainless Steel Concentric /Eccentric reducer 4''   Pipepipe fittings

TOBO STEEL GROUP CHINA

Verified Supplier
11 Years
shanghai, shanghai
Since 1998
Business Type :
Manufacturer, Agent, Importer, Exporter, Trading Company, Seller
Total Annual :
100000-100000000
Employee Number :
200~300
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement