eccentric and concentric reducer large supply stainless steel carbon steel pipe fittings
Product introduction
1.Low Density and High Strength
2.Excellent Corrosion Resistance
3.Good resistance to high temperature
4.Excellent Bearing to cryogenic property
5.Good thermal properties
6.Low Modulus of Elasticity
7.Toughness, light weight
8.High property of acid and alkali resistance
Type | Concentric Reducer R(C) Eccentric Reducer R(E) |
Standard | ASME B16.9, ASME B16.11, ASME B16.5; JIS B2311,JIS B2312,JIS B2313,JIS B2316; MSS SP-43, MSS SP-95, MSS SP-75, MSS SP-79; ISO 3419,ISO 5251,DIN 2615 SY/T 0510, SH 3408, SH3410 |
Size | 1/2''-48''(Butt-welding and seamless);1/8''-4''(Threaded and socket-welding); 16''~72''(Welded) |
Wall thickness | SCH10,SCH20,SCH30,STD,SCH40,SCH60,XS,SCH100,SCH120,SCH40,SCH160,XXS |
Manufacturing process | Hot forming, Push, Press, Forge, Cast, etc. |
Essential details
- Place of Origin:
-
China
- Brand Name:
-
TOBO
- Model Number:
-
Eccentric Reducer
- Technics:
-
Welded, Forged, Rolled, Seamless
- Connection:
-
Welding
- Shape:
-
Reducing
- Head Code:
-
round
Supply Ability
- Supply Ability
- 5000 Piece/Pieces per Month
Packaging & delivery
- Packaging Details
- 1)Plastic and paper inside,fixed between wooden pallets.
2)IPPC standard Wooden case
3)Special package upon request
- Port
- Shanghai
- Picture Example:
-
- Lead time:
-
Quantity(pieces) | 1 - 1000 | >1000 |
Lead time (days) | 10 | To be negotiated |
FAQ
1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the Alibaba certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to
quantity.
3.Where is your factory located? How can I visit there?
We locate in Daqiuzhuang Town, Jinghai District, Tianjin, China, 30 minutes from Beijing by train.
4. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
5. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.