Super Duplex UNS S32750/S32760/S31803 ASME B16.9 Fittings 1-48 Inch Stainless Steel Pipe Tee Seamless
Main Production Name | 45 / 90 / 180 Long / Short Radius Elbows, Equal / Reducing Crosses, Concentric /Eccentric Reducers, Caps, Stub Ends,Pipe fittings |
Size Range | From ½” up to 106” |
Schedule | SCH STD, XS, XXS, SCH 10 ~ SCH 160 |
Main Material Code: | |
Carbon Steel | ASTM A234 WPB, WPC; ASTM A420 WPL9, WPL3, WPL6, WPHY-42 |
WPHY-46, WPHY-52, WPHY-60, WPHY-65, WPHY-70, | |
Alloy Steel | ASTM A234 WP1, WP11, WP12, WP22, WP5, WP9, WP91 |
Nickel alloy steel | Inconel 600, Inconel 625, Inconel 718, Inconel X750, Incoloy 800, |
Incoloy 800H, Incoloy 825, Hastelloy C276, Monel 400, Monel K500 | |
Stainless Steel | ASTM A403 WP304/304L, WP316/316L, WP321, WP347, WPS 31254 |
Duplex stainless steel | ASTM A 815 UNS S31803, UNS S32750, UNS S32760 |
Standard | ANSI, ISO, JIS, DIN, BS,GB, SH, HG,QOST,ETC. |
Certification: | ISO9001:2000 , API , BV , , LOIYD |
Applications range: | Petroleum, chemical, power, gas, metallurgy, shipbuilding.construction,water and nuclear power etc. |
Quality | High lever |
The third party inspection: | BV,,LOIYD,TUV,and other party alloyed by clients. |
Delivery Time: | At the earliest ,within the period required by customer. |
Remark: | Also can supply IBR fittings and Specialized NACE & HIC Fittings |
Package:Standard export carton packing.
Delivery time:stock-30 days after confirming order,detail delivery date should be decided according to production season and order quantity.
Advantages:
1. 20 + years of production experience at your service.
2. The fastest delivery
3. The lowest price
4. Most comprehensive standards and materials for your choice.
5. 100% export.
6. Our products EXPORT to Africa, Oceania, mid east, eastern Asia, Western Europe etc.
FAQ:
We are manufacturer ,You can see the Alibaba certification.
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Yes, we could offer the sample for free charge but need pay the cost of freight.
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.