300mm x 50mm Foreign Original Galvanized Wire Merge Cable Tray By 3 Meter Roll Forming Machine
New Type Cable Tray
Easy Installation / Saving time / High Effiency / No need more bolts
Normal Cable Tray Sizes
No. | Width/mm | Height/mm | Thickness/mm | Length/mm |
1 | 100-900 | 50-150 | 0.8-1.5 | Any length |
Cable Tray Roll Forming Machine
No. | Name | Type and size | Quantity | (KW) Power(kw) |
1 | De-coiler | 1 set | ||
2 | Straightener | 1 set | 4 | |
3 | Servo-feeder | 1 set | 4 | |
4 | Punching Press | YANGLI GROUP | 1 set | 25 |
5 | Punching Mould | 1 set | ||
6 | Conveying Table | 1 set | ||
7 | Roll Forming machine | Full automatic control type | 1 set | 15 |
8 | Collection table | 1set | ||
9 | Electric Control System | 1 set | 7.5 |
1, Equipment capabilities
It can according to the need to produce the steel width (60mm≤§≤860mm), many kinds of specification electric cable bridges and other structure product.
Product speed by punching: 2.55m/min
Continuous rollforming speed: 10-15m/min
Material thickness: 1~2mm
Material require: Q235 cold roll steel
Production line has automatic and manual two operating mode, may realize the linkage and the partition revolution work.
2, Main composition of machine
This unit consists of the decoiler, ML-900 flatting, 200 punch, die, servo feeding, guider, main roll forming machine, follow cutting, cut-to-length part, recoiler, electrical control cabinet; etc.
3,Machine Parameter
NO. | Project | Unit | Parameter | Remark | |
1 | Material | Type | High strength steel | ||
Strength of material sheet | Map | ≥350 | |||
Thickness of material sheet | mm | 1.2~2.0 | |||
2 | Size of production | mm | Reference the picture | ||
3 | Production speed | m/min | Punching speed 4m/min Forming speed 10m/min | ||
4 | Material of roller | GCr15 quenching treatment | |||
5 | Drive type | Gear | |||
6 | Power | kw | About 75 | ||
7 | Electric control system | PLC variable frequency control | |||
8 | Dimensions(Length*width*height) | m | 55X4X3.9 |
Service from BOSJ
BOSJ offer engineers to install and commision the machines at buyer's factory,and also train your workers to operate the machine.
Guarantee: one year after finishing machine installation and commission at buyers' factory.
24 hours response time
a) Mechnical engineering team with 10 actual working experience
b)Electrical engineering team with 10 actual working experience