Q195 Sae1006 Sae1008 Low Carbon Hot Rolled Mild Steel Wire Rod In Coils
How to work with steel wire?
When it comes to working with steel wire, there are a few things to keep in mind. First, always use gloves when handling the wire as it can be sharp. Second, avoid using any abrasive cleaners as they can damage the wire. Finally, make sure to always cut the wire with a clean pair of shears to avoid any fraying.
What is steel wire used for?
There are many uses for steel wire. It can be used to make nails, screws, jewelry, and even fishing line. It is also used in construction to reinforce concrete and in the manufacturing of wire mesh.
Specification
Item | steel wire 201 304 316 1.50mm steel wire rods |
Standard | AISI ASTM DIN EN GB JIS |
Grade | 200/300/400 Series |
Length | As Required |
Application | Chemical Industry, Food, Petroleum, Energy, Power |
Certification | ISO |
C Content (%) | ≤0.08% |
Si Content (%) | ≤1.00% |
Model Number | 200CU/204CU/201CU/304/316/410/430 |
Tolerance | ±10% |
Processing Service | Bending, Welding, Decoiling, Punching, Cutting |
Steel Grade | 304, 304L, 316, 316L, 410, 430, 200CU, 204CU, 201CU, 304ES |
Surface Finish | Bright or Matt |
Galvanized steel wire | |
Quality Standard | GB/T343; BS EN 10257-1:1998; GB/T3028; BS 4565; ASTM B-498: 1998 GB/T15393; BS EN 10244-2:2001 |
Raw Material | A: 1006, 1008, 1018, Q195, Q235, 55#,60#,65#,70#,72A, 80#,77B,82B B: 99.995% Purity Zinc |
Size Range | 0.15mm-6.00mm |
Tensile Strength Range | 290MPa-1200Mpa |
Zinc Coating | 15g/m2-600g/m2 |
Packing | Coil, Spool, Wooden Drum, Z2, Z3 |
Packaging Weight | 1kg-1000kg |
carbon steel wire | |
Variety | Soft wire,hard wire,spring wire,electrode wire,cold heading wire,electrolytic wire, welding wire etc |
Size | 0.5-20.0MM |
Special specifications can also be produced according to drawing and sample | |
Material Grade | Low/High Carbon Steel |
Standard | AISI/ASTM/SUS/GB/DIN/EN/BS |
Packing | Export-sea worthy packing with each bundle tied and protected |
Application | Construction, Wire Drawing,Welding Electro,Nail |
MOQ | 3 ton |
Trade Term | FOB Shanghai, China or CIF discharging port |
Payment term | T/T ,L/C |
Sales Mode | Factory direct sales |
Delivery Time | 7-15 days or depend on order quantity |