Butt Welding Hot Galvanized Carbon Steel Pipe Reducer
Supply Ability
- Supply Ability
- 10000 Piece/Pieces per Month
Packaging & Delivery
- Packaging Details
- 1. Standard export packaging;
2. As Customers' Requirements;
- Port
- DALIAN/TIANJIN,/SHANGHAI,/NINGBO, CHINA
- Lead Time:
-
Quantity(Pieces) | 1 - 100 | 101 - 500 | >500 |
Est. Time(days) | 1 | 3 | To be negotiated |
BUTT-WELDING PIPE FITTINGS |
| Carbon Steel: |
ASTM, A234WPB, A234WPC, A420WPL6, Q235,10#, A3, Q235A, 20G, 16Mn |
DIN St37, St45.8, St52.4, St.35.8, St.35.8. |
Stainless Steel: |
1Cr18Ni9Ti 0Cr18Ni9 00Cr19Ni10 0Cr17Ni12Mo2Ti |
00Cr17Ni14Mo2 304 304L 316 316L |
Alloy Steel: |
16Mn Cr5Mo 12Cr1MoV 10CrMo910 15CrMo 12Cr2Mo1, |
A335P22 St45.8, ASTM A860 WPHY X42 X52 X60 X70 |
| ASME/ANSI B16.9, B16.11, B16.28, JIS B2311, B2312, B2312, B2316 ASTM A403 MSS SP-43, SP-83, SP-97 |
| 1.Tee (Straight and Reducing) 2.180 DEG Return |
3.Elbow (45/90/180 DEG) 4.Cap |
5. Reducer (Concentric and Eccentric) |
| Seam Or Seamless |
| 45 degree, 90 degree, 180 degree |
| Black Paint, Anti Rust Oil, Hot-Dipped Galvanize |
| SCH5S, SCH10S, SCH10, SCH20, SCH30, SCH40, STD, XS, SCH60 |
SCH80, SCH100, SCH120, SCH140, SCH160, XXS, 2MM |
| 1/2"-48"(Dn15-Dn1200) |
| Welding |
| Equal, Reducing |
| ISO9001 API TUV |
| Petrochemical & Gas industry, Power industry, Valve industry, Water works, Shipbuilding industry, Construction etc |
Customers’ drawings or designs are available. |
| 1. 1/2" - 2" in Cartons. |
2. Above 2" in Fumigation Wooden Cases. |
3. Big size is workable by Pallets. |
| Normal delivery time is from 15 to 45 days according to the quantities and specifications of each order |
Q1: What is your terms of payment?
A: 30% T/T in advance, the balance 70% before delivery. We will show you the photos of products and package before you pay the balance.
Q2: what is the terms of delivery?
A: EXW, FOB, CIF, CFR, DDU
Q3: What is the terms of packing?
A: generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.
Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after we received your deposit.
For production period, it usually takes about 15 days-30 days after receiving the deposit.
Q5: Could you produce according to the samples?
A : Yes, we could customer-made by your samples or technique drawings, we could build the mold and fixtures.
Q6: Could you provide the samples?
A: yes, we could provide the free samples on conditons it is available in stocks, however, the the transportation fee is borne by buyer.
Q7: How could you guarantee your products?
A: Each piece of products is manufactured by certified workshops, inspected by Lenser piece by piece according to national QA/QC standard. We also could issue the warranty to customer to guarantee the quality.
Used to the pipes connecting ,
Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etc


