Specifications
Brand Name :
YiHang
Model Number :
YH-3
Certification :
API/ISO
Place of Origin :
Hebei China
MOQ :
1 pc
Price :
Negotiate
Payment Terms :
L/C, T/T
Supply Ability :
5000 Tons/Month
Delivery Time :
3-10 Days
Packaging Details :
Wooden box / Pallet
Application :
Pipe Lines Connecting
connection :
Butt Weld
Pipe Type :
Seamless or Seam remove
Keyword :
Tee
Standard :
GB
Wall thickness :
SCH10S SCH20 STD SCH40 SCH80
Description

Oil And Gas Process Seamless A 105 Carbon Steel Pipe Tee

Product Description:

Material: Carbon Steel: ASTM/ASME A234 WPB/WPC; A420 WPL6; ASTM A860 WPHY42/52 /60/65/70/75, ST37.0, ST35.8, ST45.8, 10CRMo910, 15CrMo, 12Cr1MoV,etc;
Alloy Steel: A234 WP1/WP2/WP5/WP9/WP11/WP12/WP22/WP91, etc;
Stainless Steel: A403 WP304/304L; WP316/316L/316H;WP347H,etc.
Standard: ASTM/JIS/DIN/BS/GB
ASME B16.9, ASME B16.28, MSS SP43, DIN2605,DIN2617,DIN2516,JISB2311,etc; or design as the clients' requests;
Usage:Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etc

OD 15mm-6000mm
Pressure 150#-2500#, PN0.6-PN400, 5K-40K, API 2000-15000
Standard ANSI B16.5, EN1092-1, SABA1123, JIS B2220, DIN, GOST, UNI, AS2129, API 6A, etc.
Wall thickness

SCH5S, SCH10S, SCH10, SCH40S, STD, XS, XXS, SCH20, SCH30, SCH40, SCH60,

SCH80, SCH160, XXS and etc.

Material

Duplex stainless steel: UNS31803, SAF2205, UNS32205, UNS31500, UNS32750,

UNS32760, 1.4462, 1.4410, 1.4501 and etc.

Pipeline steel: A694 F42, A694F52, A694 F60, A694 F65, A694 F70, A694 F80 etc.

Nickel alloy: inconel600, inconel625, inconel690, incoloy800, incoloy 825, incoloy 800H,

C22, C-276, Monel400, Alloy20 etc.

Cr-Mo alloy: A182F11, A182F5, A182F22, A182F91, A182F9, 16mo3 etc.

Application

Petrochemical industy; avation and aerospace industry; pharmaceutical industry;

gas exhaust; power plant; ship buliding; water treament, etc.

Advantages Ready stock, faster delivery time; available in all sizes, customized; high quality

Q1: What is your terms of payment?

A: 30% T/T in advance, the balance 70% before delivery. We will show you the photos of products and package before you pay the balance.

Q2: what is the terms of delivery?
A: EXW, FOB, CIF, CFR, DDU

Q3: What is the terms of packing?
A: generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.

Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after we received your deposit.
For production period, it usually takes about 15 days-30 days after receiving the deposit.

Q5: Could you produce according to the samples?
A : Yes, we could customer-made by your samples or technique drawings, we could build the mold and fixtures.

Q6: Could you provide the samples?
A: yes, we could provide the free samples on conditons it is available in stocks, however, the the transportation fee is borne by buyer.

Q7: How could you guarantee your products?
A: Each piece of products is manufactured by certified workshops, inspected by Lenser piece by piece according to national QA/QC standard. We also could issue the warranty to customer to guarantee the quality.

Q: Can you accept custom order?
A: Yes, we can supply. Please provide flange drawings to our sales.

Q: Can you supply Form e, Cerficiate of origin?
A: Yes, we can supply.

Q: Can you supply invoice and CO with chamber of commerce?
A: Yes, we can supply.

Q: Can you accept L/C deferred 30, 60, 90days?
A: We can. Please negotiate with sales.

Q: Can you accept O/A payment?
A: We can. Please negotiate with sales.

Q: Can you supply samples?
A: Yes, some samples are free, please check with sales.

Q: Can you supply the products which comply with NACE?
A: Yes, we can.

Q: How long is your delivery time?
A: 20~35 days.

Q: Do you provide samples? Is it free or extra?
A: Yes, we can provide samples for free but you will afford the shipping cost.

Used To:

Used to the pipes connecting ,

Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etc

Advantages And Characteristics:

Manufacter supplis strightly , of good quality and big quantity .

Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etcUsed to the pipes connecting

Seamless A105 Equal Tee Pipe Fitting 3 Way For Oil Gas ProcessSeamless A105 Equal Tee Pipe Fitting 3 Way For Oil Gas ProcessSeamless A105 Equal Tee Pipe Fitting 3 Way For Oil Gas Process

Send your message to this supplier
Send Now

Seamless A105 Equal Tee Pipe Fitting 3 Way For Oil Gas Process

Ask Latest Price
Brand Name :
YiHang
Model Number :
YH-3
Certification :
API/ISO
Place of Origin :
Hebei China
MOQ :
1 pc
Price :
Negotiate
Contact Supplier
Seamless A105 Equal Tee Pipe Fitting 3 Way For Oil Gas Process
Seamless A105 Equal Tee Pipe Fitting 3 Way For Oil Gas Process
Seamless A105 Equal Tee Pipe Fitting 3 Way For Oil Gas Process

Hebei Yihang Pipe Industry Co., Ltd.

Site Member
4 Years
hebei, cangzhou
Business Type :
Manufacturer
Employee Number :
100~120
Certification Level :
Site Member
Contact Supplier
Submit Requirement