Car Parts Mould , Black Panel Below Steering Wheel for Obstructing Electronical Wires
Production Description
Mould Base | LKM,HASCO,DME |
Cavity/core material | 2738,2343,S130,2344,718,8407,S136,P20,KD-61,NAK80,H13 ect |
Cavity QTY | Single-cavity/Muti-cavity |
Runner | cold/hot runner |
Gate | Submarie gate,side/edge gate |
Mould lifetime | 500,000 shots |
Plastic part material | PC,PA,ABS,PVC,PA66,TPE,SAN,POM.etc |
Lead time | 20-40days based on different products |
Package | Wooden cases or cartons |
Port | Shenzhen |
Design sofeware | UG/CAD/PROE |
1.We own CNC processing centers,CNC spark working machinery and various advanced mould tooling equipment.We also have established a CAD/CAM/CAE mould design and development center.
2.Our quality,price,after sale services are really competitive.
3.Long service life
4. High speed milling center and expert cooling system design.
5.Direct manufacturer and factory price
6.Iso certified and good guarantee
7. We have strong R&D team and customize design is available, to meet our customer high demands and expectations on products quality and productivity.
8.OEM welcome.
Our service
R&D | Mold design is subject to customer's requirement ,We could provide the mould design for our customers |
Neogotiation term etc | Mutual discuss for the materials ,the price ,delivery time and payment |
Place the order: | Strictly do according to the order to meet our customer needs |
Mould | Design comfirmation by our customer-Mold making strictly by the design |
Sample production | Mold first trial sample-our customer to comfirm ---move forward to batch |
Delivery | Delievry could according to our customers required by sea or by air |
FAQ
Q1. When can I get the price?
A: We usually quote within 2 days after we get your inquiry. If you are very urgent, please call us or tell us in your email so that we will regard your inquiry priority.
Q2. How long is the lead-time for mold?
A: It all depends on the mold’s size and complexity. Normally, the lead time is 25—35days.
If the molds are very simple and not big size, we can work out within 15 days.
Q3. I have no 3D drawing, how should I start the new project?
A: You can supply us a sample, we will help you finish the 3D drawing design.
Q4. Before shipment, how to make sure the products quality?
A:If you don't come to our factory and also don't have the third party for inspection, we will be as your inspection worker. We will supply you a video for production process detail include process report, products size ,structure and surface detail, packing detail and so on.
Q5.Can you do post production?
A:Some customers in addition to plastic injection require post processing, assembly of their products and packaging.
We have done this numerous times and have the facility and staff ready for these processes. You are welcome to inquire about post production if you need it. Or send us a quote request for any part you need. We will be happy to assist you with the quote or any technical, packaging, post processing or shipping inquiry.