Product Name | Plastic Injection Mould for Household Mould |
Mold Material | 1.2343, 1.2343ESR, S136, 718, 738H, P20, NAK80,1.2312,1.2738HH |
Colors | Nature, White, Black, Red, Blue, Orange |
Plastic Material | PVC/PA66/PC/PE/POM/PMMA/ABS/TPU/TPE/PE/PP.ETC. |
Mold Cavity | multi-cavity or single cavity, even family mould |
Mold life | 1 million shots for production moulds, 10,000 to 50,000 shots for prototype moulds |
Gate Syetem | Hot Runner, Cold Runner |
Mold Base | LKM, HASCO, DME, FUTUBA, MISUMI |
Design Software | Solidworks, Pro-E, CAD |
Certification | ISO9001: 2015 |
Delivery Terms | Normally EXW or FOB Shenzhen |
Company Introduction:
ERBIWA Mould is located in Guangdong Province, China. We have over 15 years experience in plastic injection moulds, especially all kinds of automotive injection molds, such as bumpers, automotive lamps, consoles, pillars, hoses and so on.
Q & A:
Q1. Are you a factory or trade company?
We are a factory of specialized in plastic mould and mould injection for 15 years.
Q2. What kind of production service do you provide?
Mould making, CNC machining, Plastics injection moulding, various metal surface treatment and customize, product design and hand-made sample.
Q3. How about the lead time?
Mould: 15-45 working days after you confirmed the drawing.
Mass production: 10-20 working day after confirmed sample.
Q4. How about your quality?
♦Our management and production executed strictly according to ISO9001:2008 quality System.
♦We will make the operation instruction once the sample is approval.
♦ We will 100% inspect the products before shipment.
♦If there is quality problem, we will supply the replacement by our shipping cost.
Q5. What is your quotation element?
1.Drawing or Sample, Material, finish and Quantity .
2.If you have no drawing, we can help you design the drawing base on your requirement.
Q6. How to get the quote ??
Please send your drawing(PDF,JPG,DXF,DWG,STEP,IGS,XT...) to us, and tell us the material,quantity,finish and so on, then we quote you within 12 hours.
Q7. What is your payment term?
Mould: 40% deposit with PO, 30% after T1 and 30% before shipment.
Plastic Parts: 50% deposit with PO, and 50% paid before shipment.