Digital Box Printing / Zipper Shipping Boxes Machine / Power18 KW (380V AC 3φ 50Hz)
Instruction:
Semi-automatic press model folder&gluer speicail to meet middle and small orders, small CBM, easy operation, widely use range, it is suit for normal box, special shape color box. Add automatic gluing device also can produce hook bottom box and earth cover carton, save glue, labour, maxmium run speed 60m/min, the effective is 3-4times than normal mahcine; gluing firmly, trimly and don't over glue,with double head sander remove UV or film. Improve adhensive.
Advantages:
This machine can be added with a shell, which is not only beautiful, but also has a protective effect.As shown below .
E-commerce special zipper carton third generation glue process
Compared with the first generation of double-sided glue, the second generation of foam glue two adhesive materials, the third generation of technology advantages are very obvious.
1, 10000 meters long endurance, production efficiency increased by 35%.
2, hot melt adhesive material cost is 40% of double-sided adhesive.
3, environmental protection degradation (double-sided adhesive can not be completely degraded).
Product parameters:
Model | HM1300 | Working width | 1310MM |
material | ≥300g/m²cartons | Air compressor | min. 6 bar |
Minimum paper size | 250mm×250mm | total power | 18 KW (380V AC 3φ 50Hz) |
Maximum paper size | 1300mm×1050mm | weight | 1600KG |
The highest speed | 60m/min-100m/min | Machine dimensions | 6600*2100*1600 |
After-sales service:
1. The initial installation training includes written process training and on-site training until you can operate the machine independently and safely. The general training is 3-5 days before you can proficiently operate the machine independently. After the training, you can contact our after-sales staff by telephone or video at any time.
2. The quality warranty period shall be within 12 months from the date of completion of installation and debugging. During the warranty period, Party B shall repair and replace relevant parts free of charge if there are any quality problems of the product. If the subject matter is damaged and parts need to be replaced due to party A's factory reasons or improper operation, Party B shall only charge the cost of the replacement parts during maintenance and provide lifelong service.
3. After receiving the warranty notice, if the problem cannot be solved by phone or wechat video, the maintenance personnel must arrive at the site for service within 24 hours.
4. If our staff comes to your company's urban area (new machines are installed within 2 months in the Yangtze River Delta area), we will visit your company's workshop irregularly to provide services, record every problem reported by users, continuously improve products, and create maximum value for users.