Zipper Shipping Boxes Machine / Dimensions 6600*2100*1600 / Type Carton Machine
Product parameters:
Model | Z1000-4A | Working width | 1310MM |
material | ≥300g/m²cartons | Air compressor | min. 6 bar |
Minimum paper size | 250mm×250mm | total power | 18 KW (380V AC 3φ 50Hz) |
Maximum paper size | 1300mm×1050mm | weight | 1600KG |
The highest speed | 60m/min-100m/min | Machine dimensions | 6600*2100*1600 |
Main structure:
1. folder gluer machine it is composed of main frame and two small conveyors ;
2. Main frame is composed of lifting work platform,front conveyer equipment,
front gluing equipment,middle conveyer equipment,middle paper pressing equipment and electrical control equipment.
3. The gluing roller adopts wear-resisting alloy materials, the binder box adopts nylon and wear resistant materials,
both of them are vulnerable components, so the operating workers have to use clean water to wash it cleanly
Working principle:
Put the prepared glue into gluer bucket,press each switch button,when everything is in order,
turn on the switch below gluer bucket,enable the glue successfully into the head of gluer,
then well remove carton,so one side of the carton can be well-distributed glue when across bottom of the head gluer while the other side of carton
can be firmly joint together after middle press- roll pressing.
our services:
A: The initial installation training includes written process training and on-site training until you can operate the machine independently and safely. The general training is 3-5 days before you can proficiently operate the machine independently. After the training, you can contact our after-sales staff by telephone or video at any time.
B: The quality warranty period shall be within 12 months from the date of completion of installation and debugging. During the warranty period, Party B shall repair and replace relevant parts free of charge if there are any quality problems of the product. If the subject matter is damaged and parts need to be replaced due to party A's factory reasons or improper operation, Party B shall only charge the cost of the replacement parts during maintenance and provide lifelong service.
C: After receiving the warranty notice, if the problem cannot be solved by phone or wechat video, the maintenance personnel must arrive at the site for service within 24 hours.
D: If our staff comes to your company's urban area (new machines are installed within 2 months in the Yangtze River Delta area), we will visit your company's workshop irregularly to provide services, record every problem reported by users, continuously improve products, and create maximum value for users.