Zipper Shipping Boxes Machine Amazon Boxes / 1600kg / ≥300g/M² Cartons
product description:
The fully automatic double-sided tape sticking machine is used by Deshisen Co., Ltd. for single-sheet water-based printing, offset printing, color-mounted corrugated cartons, cardboard color boxes, etc.
Any type of inkjet coding system can be set on the platform for variable information printing, and a labeling head can be installed as an option. It is also possible to install the local label function.
This series adopts a more optimized modular design, users can have more personalized choices, and realize the design concept of one machine with multiple functions.
The equipment is widely used in pharmaceutical packaging, food packaging, logistics packaging, gift box packaging and other fields.
Advantages:
This machine can be added with a shell, which is not only beautiful, but also has a protective effect.As shown below .
zipper shipping boxes machine | |||
Warranty | one year | ||
weight | 1600KG | ||
Minimum paper size | 250mm×250mm | ||
Maximum paper size | 1300mm×1050mmweight 1600KG | ||
speed | 60m/min-100m/min | ||
dimensions | 6600*2100*1600 |
List of vulnerable parts:
model | picture | quantity | unit | Notes |
Tooth blade (15 teeth) | ![]() | 4 | slice | |
Press wheel + wrap adhesive | ![]() | 4 | piece | |
The flat cutter | ![]() | 2 | piece | |
The belt | ![]() | 1 | piece |
After-sales service:
1.The initial installation training includes written process training and on-site training until you can operate the machine independently and safely. The general training is 3-5 days before you can proficiently operate the machine independently. After the training, you can contact our after-sales staff by telephone or video at any time.
2. The quality warranty period shall be within 12 months from the date of completion of installation and debugging. During the warranty period, Party B shall repair and replace relevant parts free of charge if there are any quality problems of the product. If the subject matter is damaged and parts need to be replaced due to party A's factory reasons or improper operation, Party B shall only charge the cost of the replacement parts during maintenance and provide lifelong service.
3. After receiving the warranty notice, if the problem cannot be solved by phone or wechat video, the maintenance personnel must arrive at the site for service within 24 hours.
4. If our staff comes to your company's urban area (new machines are installed within 2 months in the Yangtze River Delta area), we will visit your company's workshop irregularly to provide services, record every problem reported by users, continuously improve products, and create maximum value for users.