Palletizer machine for pails
Robot grappling fixture grabs the bottles from the bottle conveyor, then the grappling fixture moves upwards above the bottle conveyor, grappling fixture moves upwards above the box conveying device, and then the bottles move downward into the box.
Description of palletizer :
Characteristics:
(1) According to the set program and the products in place signal of the production line, the robot pick the products automatically from the production line.
(2) The PLC controls the whole system including signal exchange of the robot,products in place signal,beats position signal and other logical relations.
The palletizer can be customized according to different products and request.
a. Designed for stacking various types of pails.
b. Adopts man-machine interface English screen ,provides display for trouble causes,self-diagnosis and trouble positions.
c. Carton/bag stacking quantity and layers can be set on the control panel.
d. Touch screen provides memory capability to memorizing the stacking program for saving setting time.
e. All moving parts are equipped with grease nipples for covenient lubrication and maintenance.
f. Low table construction allows for convenient maintenance and shooting trouble.
Specifications:
Model | WKD-MD-R |
Power supply | 380V,50/60Hz,9KW |
Air pressure | 0.5~0.7MPa |
Machine dimension | See robot size |
Palletizing speed | 10 cycles/min |
Our company:
FAQ:
1. Are you a factory or trading company?
We are a professional packaging machine manufacturing factory that set up for 10 years. We always pay attention to the development of the industry. We can give a discount according to the quantity of machine you purchase.
2. How long can I get feedback after inquiry?
We will reply you within 10 hours in working day.
3. Where is your factory located? How can I visit there?
Our factory is located in Qian Deng Town, Kun Shan City, Jiangsu Province, China.
We will provide pick-up service if you want to visit our company. You can choose the destination of Pudong airport or Hongqiao airport. Hongqiao airport will be much more closer to our company.
4. Delivery time
Machines & molds order takes 55 work days after pre-payment received.
5. What is the package? Is it suitable for shipment?
Machines will be packed by the standard wooden case or PE film wrapping.
It is suitable for shipment.
6. Payment term
30% by T/T as down payment, balance 70% by T/T or L/C before delivery.
7. Can I trust you?
Sure, we are the manufacturer certified by SGS and CE,
8. How long is the warranty for machines?
Machines warranty is 12 months from installation & commissioning.
9. How' s your after-sale service?
After sales support and service is very important to customers and we will respond to you soon if parts are required they would be sent to you by international courier within 48 hours.
10. Can you engineer come to our place to help with machine installation & commission?
Yes, our engineers are available to travel to your place. Round flight tickets & accommodation will be at your cost. And the cost for our labor is one hundred USD per person per day.
11. How to send my inquiry?
You can contact us by email, phone call, Instant Messenger (WhatsApp, WeChat, Skype)