Product name: 115mm MK5E108 Overburden Casing Drilling System Hole Opener Drill Bit For Geothermal Drilling
Product category: Overburden casing drilling system
Matched hammer: Hammer CIR90
Matched casing pipe OD: 108mm
We are able to meet the drilling needs of our Mining and Quarrying customers, while ensuring maximum efficiency and productivity. The measures of success in exploration drilling are sample quality and rate of productivity.
MK5E Overburden Casing Drilling System Bit, designed to meet all your drilling needs. With its exceptional features and superior performance, this drill bit is a game-changer in the industry.
One key feature of our MK5E Bit is the hardening treatment applied to its surface. This treatment not only enhances the durability of the bit, but also significantly extends its operating life. Say goodbye to frequent replacements and hello to a longer-lasting and cost-effective solution. Additionally, the anti-wear properties of our drill bit ensure that it remains in prime condition even after prolonged use.
MK5E Overburden Casing drilling system technical parameters
Technical Parameters | |||
Model | Reaming Diameter(mm) | Casing Diameter(mm) | Equipped Hammer |
MK5E108 | 115 | 93-99 | 90 |
MK5E127 | 130 | 115-117 | 110 |
MK5E146 | 155 | 130-134 | 110/340 |
MK5E168 | 185 | 148-156 | 110/340 |
MK5E178 | 195 | 158-166 | 150/340 |
MK5E183 | 196 | 168-176 | 350/360 |
MK5E193 | 206 | 176-182 | 360 |
MK5E219 | 236 | 199-207 | 360 |
Other size of MK5E system is available upon customer's request
Order Guide: Casing Tube OD & ID + Reamer Bit Diameter + Minimal Casing Shoe ID + Hammer Shank Style
Application range
It is suitable for drilling water wells, geothermal wells, short micropiles, medium mini-type grounting hole of building, dam and harbour project.
MK5E Casing drilling tools advantage:
1. Simple structure
2. Easy operation
3. Reliable quality
4. Retrievable drilling tools
5. Long service life
FAQ:
1. What is casing design?
The design of a casing program involves the selection of setting depths, casing sizes and grades of steel that will allow for the safe drilling, and completion of a well to the desired producing configuration.
2. How does a casing advancer Work?
Drilling and casing can be done simultaneously as a single, integrated operation thanks to the Casing Advancer's design. The big diameter hole can now be drilled with a rock bit without the requirement to remove the drill rod string and rock bit from the hole, then ream the casing back into the hole thanks to this functionality.
3. Where does overburden go during a mining operation?
Overburden is used for reprocessing, contouring land, and as a construction aggregate for buildings and roads. Mine tailings are reused for producing clay, tiles, glass, and concrete. Mine water is treated and then used for dust and particulate suppression, agricultural/industrial use, and as a coolant.
More information: