Stainless Steel 150LB CF8M Equal Tee SS Pipe Fittings
1. This is stainless steel 150LB CF8M equal tee,we produce according customs drawings.
2. SS pipe fittings belong to a kind of pipe fittings. It is made of stainless steel material, so it is called SS pipe fittings.
3. It includes: SS pipe fittings elbow, SS pipe fittings tee, SS pipe fittings tee, SS pipe fittings reducer, SS pipe fittings cap, etc. according to the connection method, it can be divided into socket SS pipe fittings, threaded SS pipe fittings, flange SS pipe fittings and welded SS pipe fittings.
4. Stainless steel tees are SS pipe fittings and pipe connectors. It is used at the branch pipe of main pipeline. SS pipe fittings tees can be divided into equal diameter and different diameter.
5. The nozzle ends of equal diameter tees are of the same size; the nozzle sizes of main SS pipe fittings of different diameter tees are the same, while the nozzle sizes of branch pipes are smaller than those of main pipes.
Standard:GB/T12459,GB/T13401,ASME B16.9,SH3408, SH3409,HG/T21635,DL/T 695,SY/T 0510,DIN 2615.
Application:Suitable for fire piping system, air, steam, water,gas, oil , home decoration , equipment and so on
Product Name | Stainless Steel 150LB CF8M Equal Tee SS Pipe Fittings |
Material | Stainless Steel: SS304, SS316, 1.4401, 1.4301, CF8, CF8M |
Size | 1/8" to 4" |
Standard | Design: ISO4144, MSS-SP-114, etc |
Type | Elbow, Tee, Coupling, Socket, Hexagon Nipple, Bushing, Cap, Plug, Hose Nipple, Barrel Nipple, Reducer, Union, etc. |
Pressure | 150 LB |
Connection | NPT, BSP, BSPT, DIN2999, Socket Weld |
Certificate | ISO 9001 |
FAQ
Q: What's the package and how do you ship the goods?
A: Products are usually packed in cartons and transported by logistics.
Q: How long is your delivery time?
A: Generally it is 2-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample as request but not for free charge.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.