8-20mm 1000-12000tons Upcasting Copper Rod Manufacturing Machine
Introduce:
Upcasting Copper Rod Manufacturing Machine is used to produce the long and bright oxygen-free copper rod. The induction melting furnace melt the copper cathode into liquid, the liquid keeps off the air by charcoal or graphite flake in case of be oxidation. The holding furnace keeps the copper liquid temperature in 1150℃±10℃, the casting machine crystallizes the copper liquid in crystallizer quickly, then continuously produces copper rod, then the final product will be finished through the double head take up machine and other accessory equipment.
Main Parameter :
No. |
Item |
Data |
1 |
Model No |
SYJ(02-24)**(08-35)-I2/3 |
2 |
Annual capacity |
1000-12000tons |
3 |
Furnace structure |
3 body (2 melting,1 holding ) |
4 |
Casting Strands |
2-24 |
6 |
Casting rod diameter: |
Ф8mm-Ф35mm |
7 |
Upward casting speed |
0~3000mm/min or 0-1500mm/min |
8 |
Annual working time |
7920hour |
9 |
Liquid tracking precision |
±2mm |
10 |
Take-up coil standard |
Ф700mm × Ф1500mm× 800mm |
11 |
Copper melting velocity |
260-2525kg/h |
12 |
Copper melting power consumption |
<350kwh/ton |
13 |
Take-up form |
automatic adjust |
14 |
Take-up plate driven approach |
inverter motor, PLC control |
15 |
Material feeding method |
whole piece of electrolytic copper cathode fed by electric hoist |
16 |
Upward driven approach |
driven by the AC servo motor, transmission chain is driven by the gapless synchronous cog blet |
17 |
Rod clamping method |
air clamping or manual clamping |
|
Why Choose Us?
a. We have experienced team and high-tech equipments.
b. Our machine is good of quality .
c. We can make product according to your requirements.
d. We can offer you very competitive price.
e. You can get expert guides from us all the time.
f. we have perfect service,timely customer response
Delivery:
1. Delivery time: 60 working days after the complete receipt of the deposit.
2. The buyer bears the equipment transportation and insurance costs; the buyer provides
unloading tools and bears the unloading costs.
3. When the equipment arrives at the buyer's site, the buyer should check the goods, sign written receiving records, and confirm the consistency between the goods and the lists of shipment.
Welcome to contact us !!