Specifications
Brand Name :
CEC TANKS
Model Number :
W20180508003
Certification :
ISO 9001:2008, AWWA D103 , OSHA , BSCI
Place of Origin :
CHINA
MOQ :
1 SET
Price :
$5000~$20000 one set
Payment Terms :
L/C, T/T
Supply Ability :
60 sets per month
Delivery Time :
10-30 days after deposit received
Packaging Details :
PE poly-foam between each two steel plates;wooden pallets and wooden box
Coating Color :
Dark green, or Customizing colors
Coating Thickness :
0.25~0.40mm, double coating
Acid and alkalinity proof :
Standard pH: 3~11, Special pH: 1~14
Adhesion :
3,450N/cm
Hardness :
6.0 Mohs
Holiday test :
>1500V
Installation :
By jacking machine or steel pole, fast in installation
Easy to clean :
Smooth, glossy, inert, anti-adhesion
Permeability :
Gas / liquid impermeable
Foundation :
Concrete or glass fused steel
Steel grade :
ART 310
Description

Dismantled, Removed, and Relocated Glass-Fused-to-Steel Flocculation Tanks: A Reliable Solution for Water Treatment Projects

Water treatment facilities often face the challenge of optimizing their infrastructure to improve operational efficiency, accommodate new technologies, or expand capacity. In many cases, the need for tank relocation arises—whether due to operational changes, facility upgrades, or site reconfigurations. Shijiazhuang Zhengzhong Technology Co., Ltd. (Center Enamel), a leader in Glass-Fused-to-Steel (GFS) tank solutions, provides a reliable and efficient solution for such needs: dismantling, removal, and relocation of Glass-Fused-to-Steel Flocculation Tanks.

As a leading storage tank manufacturer worldwide. Center Enamel can provide Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks and aluminum geodesic dome roofs, Wastewater and Biogas Project Equipments for global customers.

Configuration of Customized Storage Tanks
Storage tanks Volume Roofs Application Design Requirements

GFS Tanks

SS Tanks

Fusion Bonded Epoxy Tanks

Galvanized Steel Tanks

Welded Steel Tanks

<1000m³

1000-10000m³

10000-20000m³

20000-25000m³

>25000m³

ADR Roof

GFS Roof

Membrane Roof

FRP Roof

Trough Deck Roof

Wastewater Treatment Project

Drinking Water Project

Municipal Sewage Project

Biogas Project

Fire Water Storage Project

Oil Storage Project

Water Supply & Drainage System

Seismic Design

Wind Resistant Design

Lightning Protection Design

Tank Insulation Design

WasteWater Treatment Project Equipment Supply

Pretreatment Equipment Resource Utilization System Sludge Treatment System Other Equipment

Mechanical Bar Screen

Solid-liquid Separator

Submersible Mixer

Gas Holder

Boiler System

Boost Fan

Bio

gas Generator

Torch System

Dehydration and Desulfurization Tank

PAM Integration Dosing Device

Screw Sludge Dewatering Machine

Slurry Separation Centrifuge

Sewage Pump

Mud Scraper

Submersible Sewage Pump

Three-phases Separator

Understanding Glass-Fused-to-Steel Flocculation Tanks

Flocculation tanks are an integral part of the water treatment process, designed to allow water to mix with chemicals that facilitate the removal of suspended particles. Glass-Fused-to-Steel (GFS) tanks are widely used in these applications due to their durability, corrosion resistance, and long lifespan.

The Glass-Fused-to-Steel technology involves fusing glass to steel panels at high temperatures, creating a smooth, non-porous surface that resists rust, corrosion, and chemical reactions, making it perfect for water treatment applications. The modular construction of these tanks also allows for easy dismantling and relocation, providing unparalleled flexibility for future facility upgrades or site changes.

Why Choose Glass-Fused-to-Steel Tanks for Relocation?

There are several reasons why Glass-Fused-to-Steel tanks are ideal for relocation in water treatment projects. The modular design of these tanks allows for easy assembly and disassembly, and their long-lasting corrosion resistance ensures that even after years of use, the components will remain in good condition for reuse.

Key advantages of Glass-Fused-to-Steel flocculation tanks in relocation projects include:

Long Lifespan: Glass-Fused-to-Steel tanks are known for their durability and resistance to corrosion, ensuring that the tanks can be used for many years, even after being relocated.

Modular Design: The modular panels of Glass-Fused-to-Steel tanks can be easily taken apart, transported, and reassembled at a new location, offering flexibility and cost savings.

Reduced Maintenance Costs: Due to their corrosion-resistant properties, Glass-Fused-to-Steel tanks require minimal maintenance, even after being relocated, which lowers long-term operational costs.

The Dismantling, Removal, and Relocation Process

Relocating a Glass-Fused-to-Steel flocculation tank involves a series of well-planned steps to ensure a smooth and efficient transition. Center Enamel has extensive experience in this area, having successfully managed numerous tank relocation projects globally.

Step 1: Planning and Assessment

Before the dismantling process begins, our team conducts a thorough assessment of the tank's structure and its current location. This includes:

Reviewing the tank's design and construction details.

Evaluating the condition of the tank to ensure it is suitable for relocation.

Developing a detailed plan for disassembling the tank, which includes site preparation, logistics, and transportation arrangements.

Step 2: Dismantling the Tank

Once the plan is in place, the tank is carefully dismantled:

Disassembly of Panels: The modular panels of the Glass-Fused-to-Steel tank are unbolted and removed. The glass-coated steel panels are carefully handled to prevent damage during the process.

Removal of Components: All additional components, such as roof structures, pipes, and internal mechanisms, are removed and packed securely for transportation.

Cleaning and Inspection: The tank is thoroughly cleaned and inspected to ensure that it is in good condition for reuse after relocation.

Step 3: Transportation and Relocation

After the tank is dismantled, the components are transported to the new site:

Logistics and Transportation: The tank components are carefully packed and transported, ensuring that each part arrives safely at the new location.

On-Site Preparation: The new site is prepared for the reassembly of the tank, including foundation work and ensuring that all infrastructure, such as pipes and connections, are ready for the reinstallation of the tank.

Step 4: Reassembly and Commissioning

Once the tank components reach the new location, the tank is reassembled:

Panel Reassembly: The individual panels are bolted together to form the structure of the tank. Special attention is given to ensuring that the joints are secure and the tank is correctly aligned.

Roof and Component Installation: The roof and other components are installed, and connections are made to the existing infrastructure.

Final Inspection and Testing: The tank is inspected once again to ensure that it meets all quality standards and is ready for use. This includes testing for structural integrity and ensuring that the tank functions properly.

Why Choose Center Enamel for Relocating Glass-Fused-to-Steel Flocculation Tanks?

Center Enamel is a global leader in the design, manufacturing, and relocation of Glass-Fused-to-Steel tanks. With more than 30 years of experience, we offer:

Expertise in Tank Relocation: Our skilled team has extensive experience in the dismantling, removal, and reinstallation of Glass-Fused-to-Steel tanks, ensuring a seamless process every time.

Global Reach: We have successfully carried out tank relocation projects across the globe, offering services to a wide range of industries, including municipalities, industrial water treatment plants, and biogas plants.

Comprehensive Support: From the initial assessment to the final reassembly, Center Enamel provides full support for every step of the relocation process. Our expertise ensures that your tank will be up and running smoothly at its new location with minimal downtime.

A Sustainable Solution for Water Treatment Projects

Relocating a Glass-Fused-to-Steel flocculation tank offers an efficient and cost-effective solution for water treatment facilities looking to optimize their infrastructure. The modular design and corrosion resistance of Glass-Fused-to-Steel tanks make them an ideal choice for relocation, providing a long-term and sustainable solution.

Center Enamel is the perfect partner for managing tank relocation projects, thanks to our expertise, experience, and global capabilities. Whether you’re looking to relocate an existing flocculation tank or need support with other water treatment needs, Center Enamel is your trusted choice for high-quality, durable, and cost-effective tank solutions.

Contact us today to learn more about how we can assist you with the dismantling, removal, and relocation of Glass-Fused-to-Steel flocculation tanks and ensure the smooth transition of your water treatment facility.

Send your message to this supplier
Send Now

Dismantled, Removed, and Relocated Glass-Fused-to-Steel Flocculation Tanks: A Reliable Solution for Water Treatment Projects

Ask Latest Price
Brand Name :
CEC TANKS
Model Number :
W20180508003
Certification :
ISO 9001:2008, AWWA D103 , OSHA , BSCI
Place of Origin :
CHINA
MOQ :
1 SET
Price :
$5000~$20000 one set
Contact Supplier
Dismantled, Removed, and Relocated Glass-Fused-to-Steel Flocculation Tanks: A Reliable Solution for Water Treatment Projects

Shijiazhuang Zhengzhong Technology Co., Ltd

Verified Supplier
10 Years
guangdong, guangzhou
Since 1989
Business Type :
Manufacturer
Employee Number :
500~600
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement