High Efficiency Auto Munchy Stick Machine With Tray Loader Meaty Stick Machine Siemens Motor
Full automatic tray system can automatically pick and place tray through mechanical arm, equipped with tray store. With very high auotmation, can heavily save cost and manual labor intensity.
Top quality photoelectric sensors ensure meat strip and tray exactly matches each other, precisely length cutting control, labor saving, suitable for high standard meat strip producing.
Whole system is composed by trays storage, trays picking up, trays conveying, auto cutter, etc.
Natural Ingredients Delicious Chicken Breast Meat Strips Dog Treats Processing Line is an auto processing line can produce dog treat type meat strip. It combines two processing lines into one. With different moulds, various shapes can be made, such as strip, stick, screw shape, etc. Also, we can provide all kinds of recipe to make different tastes to full the demands of pet both for nutrition and chewing hobby.
Model | SR-126 |
Capacity | 200-300kg/hr |
Air source | 0.5-.0.8 Mpa |
Air Comsumption | 90L/min |
Tray Dimension | 680x400mm |
Quantity of Placing Tray One Tim | 40pcs |
Power | 3.75kw |
Dimension | 9000X2900X1610mm |
Machine weight | 680kg |
Meat strip extruding machine (including one set of mold)
Capacity: 200-300kg/hr Cylinder pressure: 0.4-0.5Mpa Power: 22kw Mold Surface Size: 700X325X80mm Dimension: 1200 x 1300 x 2000mm
| Meat strip extruding machine can extrude multi pieces of meat sticks. Different sizes and shapes can be made by changing the mold. Ø Specially used to produce high content (max 100%) meat products. Ø Patented design to produce meat strip with different shapes and sizes. Ø Stainless steel control cabinet, touch screen with friendly interface and fault display function. Ø The screw adopts detachable structure, and has rust-proof treatment.
|
|
Commissioning Service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning
service, and we supply a 1-year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation, and daily salary of USD 100 are on the client’s account.