Longtime Impact Resistance Asa Insulation Synthetic Resin For House Warehouse
Product Detail
Product features. Lightweight, high strength, waterproof and-lasting.
Place of Origin | Guangdong, China | Brand Name | CHENG JU |
Model Number | Mordern | Material | Synthetic Resin,UPVC,PVC,APVC |
Type | Plain Roof Tiles | Sample | Free Sample |
Color | Grass Green, Dark Gray, Sky Blue, Bordeaux Red, Chinese Red, Brick Red | Thickness | 0.8mm,1.0mm,1.2mm,1.5mm,2.0mm,2.5mm,3.0mm |
Width | 720mm,900mm,910mm,940mm,1050mm,1130mm | Length | Customized |
Weight | 5kg/per meter | Surface Course | ASA+PMMA |
Product Description




Product Advantage
Gross structure