Popular Steel Profile Glazed Tile Roof Panel High Speed Steel Wall Roof Panel Cold Rolled Steel Machine
No. | Name | Unit | Qty |
1 | Manual decoiler | set | 1 |
2 | Main forming machine | set | 1 |
3 | PLC control system | Set | 1 |
4 | Hydraulic pump station | set | 1 |
5 | post cut | set | 1 |
6 | electric motor | set | 1 |
7 | output table | set | 1 |
Uncoiling→Feeding material into machine→Roll forming→Measuring length→ Auto cutting→Products receiving
- automatic roller shutter slats door roll forming machine consist of one set decoiler, one sets of feeding platforms and one roll forming core,and one cutting dies.
- automatic roller shutter slats door roll forming machine size we can design the machine all as customize,customer just show us the profile drawing material thickness width, we can design the machine according as the request
- When we finish automatic roller shutter slats door roll forming machine, we will test the machine and adjust the machine many times to be sure the machine have a perfect status and when customer receive the machine, the machine can be used very easy
Q: Are you a manufacturer?
A: Yes, we are a manufacturer. We have 4 factories ( Machining, Assembling, Heat treatment, and Moulding ). We also have our own R&D department. Welcome to visit us.
Q: What kind of payment term do you do?
A: We do T/T and L/C.
Q: What info do you need before giving me the price and proposal?
A: Since we design individual machines based on our customer's requirements, we need your desired products' basic dimensions, including all the pipe diameter(or tube length), thickness range, usage, raw material steel grade, coil weight, and degree of automation.
Q: What should I do if I just start a new business?
A: Contact us immediately, we provide a free consultant for pre-sales service. Also, we can help you solve the raw material (steel coil) purchase, worker training, international market price, and more.
Q: How do you do QA?
A: We have a special team to do strict QA, this is one of our strengths:
(1)Every gearbox will be tested for 8 hours with oil inside to guarantee there is no leak.