Pipe Rolling Line Carbon Steel Pipe Making Machine API 5L Standard Tube Mill
Product Introduction
High-frequency welded pipe machinery is the production of low carbon low alloy steel material welded pipe special equipment, the specifications of the steel belt feeding machine will do the trick, by forming roller steel with curled up into a tube, then using high-frequency proximity effect and skin effect for tube side heat quickly to welding temperature, and under the squeezing roller extrusion complete welding, then through cooling, Sizing and roughing to the required size of steel pipe. The company's roll forming unit, FFX forming unit, roll row forming unit can produce X80, J55 API oil casing, oil, and gas pipe, in line with API-5L, API-5CT, and other standards.
Machine Parameters
Product&yield | Round Pipe | 60mm-720mm Thickness:1.5.0mm-22.0mm |
Length | 6m-12m Length Tolerance: ±3mm | |
Production Speed | 20-50 m/min | |
Production capacity | 30,000ton/year | |
Consumption | Mill installed capacity | 220 kW |
Line Area | 85m(length) ×7m (width) | |
worker | 6-8 workers | |
Raw Material | Carbon Steel coil | Q235A, Q23b, 0Cr13, 1Cr17, 00Cr19Ni11, 1Cr18Ni9, 0Cr18Ni11Nb. Q345 L245 L290 X42 X46 X70 X80 |
Width | 240mm-2200mm Thickness: 1.5mm-22.0mm | |
Coil ID | 580-700mm | |
Coil OD | Max 1800mm | |
Coil Weight | 25.0t |
Step1: Uncoiler
Uncoiler the function is to support and expand the strip, so strip can enter into machine to roll forming. Strip can be expanded by hydraulic or pneumatic and uncoiler can be rotated 180 degree. Strip expand speed can be adjusted, braking device designed with pneumatic or hydraulic cylinder to press the brake rubber block
Step2: Shear & end welding
It is used to shear the head and the end of the steel strip of two steel coils, cutting off the irregular part then welding two steel strips, so machine can work continuously.
Step3: Accumulator
Installed between shear & end welder and forming mill, horizontal spiral accumulator store a large amount of strip in a reasonable footprint space to give enough time for shear & end welder to cut and join the ends of two successive coils with non-stop tube mill
It has vertical cage type accumulator for small size tube mill
Step4: Forming
The function of this part is to make the steel strip become to the tube blank by forming rollers
Step5: welding & scarfing
The function of this part is to center the welding seam and guide the tube blank to welding device, so the welding seam will be closed before welding, use scarfing tool to remove the burr to ensure the smooth welding
Step6: Sizing
The function of this part is used to finish the tube blank from the forming machine, so the tube size can meet the physical dimension as customer required, form to square and rectangular and other shape profiles
Step7: Straightening
4 rolls turk head straightening, straighten pipe online to achieve the ideal flatness
Step8: Cut off saw
Cut off the pipe with required length, length of pipe can be set
With option of cold saw and flying saw
Step9: Run out table
This unit is to convey the finished pipe to packing, pipe transmit by dynamic roll. A signal sensing device installed in the end of run out table, when pipe touch the signal sensing device, it will feedback the signal to control panel, control panel start working and discharge the pipe
FAQ
Q: Are you a manufacturer?
A: Yes, we are a manufacturer. We have 4 factories ( Machining, Assembling, Heat treatment, and Moulding ). We also have our own R&D department. Welcome to visit us.
Q: What kind of payment term do you do?
A: We do T/T.
Q: What info do you need before giving me the price and proposal?
A: Since we design individual machines based on our customer's requirements, we need your desired products' basic dimensions, including all the pipe diameter(or tube length), thickness range, usage, raw material steel grade, coil weight, and degree of automation.
Q: What should I do if I just start a new business?
A: Contact us immediately, we provide a free consultant for pre-sales service. Also, we can help you solve the raw material (steel coil) purchase, worker training, international market price, and more.
Q: How do you do QA?
A: We have a special team to do strict QA, this is one of our strengths:
(1)Every gearbox will be tested for 8 hours with oil inside to guarantee there is no leak.
Model List | ||||
Model | Round pipe mm | Square pipe mm | Thickness mm | Working spead m/min |
ERW140 | Ф60-Ф140 | 50x50-110x110 | 2.0-5.0 | 60 |
ERW165 | Ф76-Ф165 | 60x60-130x130 | 2.0-6.0 | 50 |
ERW219 | Ф89-Ф219 | 70x70-170x170 | 2.0-8.0 | 50 |
ERW273 | Ф114-Ф273 | 90x90-210x210 | 3.0-10.0 | 45 |
ERW325 | Ф140-Ф325 | 110x110-250x250 | 4.0-12.7 | 40 |
ERW377 | Ф165-Ф377 | 130x130-280x280 | 4.0-14.0 | 35 |
ERW406 | Ф219-Ф406 | 170x170-330x330 | 6.0-16.0 | 30 |
ERW508 | Ф273-Ф508 | 210x210-400x400 | 6.0-18.0 | 25 |
ERW660 | Ф325-Ф660 | 250x250-500x500 | 6.0-20.0 | 20 |
ERW720 | Ф355-Ф720 | 300x300-600x600 | 6.0-22.0 | 20 |