Energy Saving High Output Head Cap Making Machine With Long Work Life
Easy Operation Bath cap making machine
Description:
Head cap machine is ideal machine to product head cap with high speed and fully automatic.
The caps widly used for hotel, food industry, SPA, home
Production application :
This machine is widely used in :
Machine features
1. Machine frame can be iron and aluminium.
2. Machine can make 3 different size cap without change any spare parts. Customer has to give size while place order.
3. Machine operation is done on touch screen.
4. Machine adopts speed setting, alarm, counting, temperature controller.
Our Main Machinery Area:
1. Face Mask Making Machine ( Outer/ Inside ear loop face mask welding machine, Face mask blank making machine, Face mask tie on machine , Fully automatic mask making machine).
2. PE / Non Woven shoe cover making machine
3. Non Woven Surgical Cap / Doctor Cap Making Machine, PE / Non Woven bouffant Cap Making Machine;
4. PE glove making machine
5. Plastic bag making machine
6. Tub cover making machine
Parameter
Production size | customized |
Power | 5KW |
Speed | 120-200pcs/min |
Machine size | 366*900*1400MM |
Voltage | 220V |
Machine model | GD-380 |
Company profile:
TERMS & CONDITIONS:
1. 1. Validity of Quotation:
One Month
1. 2. Delivery time:
Effected within 30 days from the date of signing the purchase contract and receipt of T/T affected for advance payment.
1. 3. Loading port:
Ningbo Port
1. 4. Payment terms :
Effect payment by T/T in two installments exactly 30% advance payment and remaining 70% payment before shipment
1. 5. Quality of Goods:
100% brand new
1. 6. Origin of Goods:
China.
Packing and Marking :
1. 7. Packing:
Wooden Pallet Packing
1. 8. Installation, Adjusting & Commissioning:
Installation and Adjusting: If required, the seller will dispatch the technician to your country for installation, adjusting the machine and training the workers at your plant. This price is inclusive of the fee of installation and debugging. However the buyer should take on all costs required during our technician’s stay in the buyer’s country, including round airplane tickets, accommodation, and food .
FAQ
Question | Answer |
1. How long will your engineer reach our factory? | Within one week after machine arrival your factory. |
2. How many days will you finish installing? | We will finish installation and training within 15days. |
3. What should we charge for your engineer? | You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 100USD one day per person. |
4. How long is your machine's warranty period? | All our machine have one year guarantee, starting from finished installation. |
5. How could we do after one year warranty period? | We also can do service for you, but you need pay salary for my technician 100USD/day. |
6. How could we do if the parts broken within warranty? | We would express the free replacement parts during the warranty date. |