Advanced customized headlamp wheel rack of UV curing equipment manufacturer
Operation process of UV CIPP curing repair technology
Ultraviolet UV CIPP light-curing repair technology is used for the overall trenchless repair of underground municipal drainage pipes.
The pipe diameter covers typical sizes. It is a process of in-situ curing method. The repair length can pass through several sections of a manhole at a time, ranging from 50m to 200m. The repair time is 3-6 hours. It is mainly aimed at sewage pipes and rainwater pipes and is applicable to various common pipes, such as plastic pipes, concrete reinforced pipes, cast iron pipes, brick pipes, etc. It is widely used all over the world because of its wide range of applications, fast construction speed, and superior performance of repair materials.
The in-situ curing method, which originated in Britain in the 1970s, is called cured in place pipe in English, or CIPP for short. It forms a complete and new pipeline with structural strength inside the existing pipeline.
The basic process is to cut the corresponding length of the pre-impregnated resin hose (glass fiber or non-woven fabric) according to the length of the pipeline to be repaired, then put the hose into the pipeline to be repaired through specific processes, such as turning and dragging, and then solidify the hose through corresponding equipment, such as hot water boiler heating, steam heating or ultraviolet light irradiation, so as to achieve the purpose of repair.
UV CIPP, as a process of in-situ curing, refers to putting the glass fiber hose impregnated with resin into the pipeline by dragging, and then irradiating it with UV equipment to quickly cure and complete the repair.
How | Fixed length for different pipes |
Application | Sewers |
QTY | Any |