Specifications
Brand Name :
DAO
Place of Origin :
Jiangsu, China
MOQ :
50m
Price :
Variable
Payment Terms :
T/T
Supply Ability :
300 km per year
Delivery Time :
15 working days
Packaging Details :
Customized as required
Liner :
Wet
Diameter :
DN850
Thickness :
9mm
Length :
70m
Weight :
Variable
Life :
50 years
Description

Wet liner for CIPP UV renovation of underground pipes by no digging method

Pull the lamp rope with the reserved rope

The reserved rope and the pull light rope shall be connected with a dead buckle to ensure that they will not fall off accidentally, and the nodes shall be wrapped with adhesive tape. Especially for the rope end of the lamp rope, it is easy to cause the inner membrane to scratch during the dragging process.

In the process of pulling the lamp rope down into the material with the reserved rope, it must be operated when the material is inflated. Otherwise, it is easy to cause inner membrane damage.

Lower lamp

Under the light of the link is the most cause intimal damage. Be careful. Before lowering the lamp, check the lamp wheel, lamp body, and connecting wire for burrs and resin. If any, clean it and treat the wheel smoothly. If it is a headlamp wheel, it is recommended to wipe a small amount of grease to reduce the friction of the material's inner membrane when the headlamp is lifted and lowered.

During the process of lowering the lamp, it is necessary to ensure that the material bulges up and the lamp enters the material smoothly without obstacles. If it cannot enter smoothly, it is necessary to find out the reasons for the obstacles. It is not allowed to drag or kick. Most of the inner membrane damage occurs at this time. The lamp shall be pulled into the material as far as possible, and sufficient length shall be reserved for the binding head for easy operation to avoid hindering the lifting of the headlamp.

Material Wet liner
Technology applied TT
Length Any length is possible

Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging

Send your message to this supplier
Send Now

Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging

Ask Latest Price
Watch Video
Brand Name :
DAO
Place of Origin :
Jiangsu, China
MOQ :
50m
Price :
Variable
Payment Terms :
T/T
Supply Ability :
300 km per year
Contact Supplier
video
Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging
Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging
Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging
Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging
Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging

Daoyunai Energy Saving Technology Limited

Verified Supplier
4 Years
shanghai, shanghai
Since 2012
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
40000000-45000000
Employee Number :
150~200
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement