0.8mm Pitch Insulation Displacement Connector Housings With LCP Material A0800
1, Detailed specification:
1. Basic information:
2. Electrical characteristic:
3. Mechanical characteristic:
Other detailed data please check the below pictures.
2, Related engineering drawing and testing report
The attached picture is our standard engineering drawing and report for your reference, it will help you to
know our product feature, then you can choose the right models.
5. Mechanical Performance
Test Description | Procedure | Requirement | ||
5-1 | Actuator Insertion & Withdrawal Force | Insert and withdraw connectors at the speed rate of 25±3mm / minute. | Refer to paragraph 7 | |
5-2 | Wire pull Out Force | Pulling load shall be applied to a correctly terminated wire in parallel and perpendicular directions. The load to pull the wire out of the socket or break the wire shall be measured. | Parallel direction | Perpendicular direction |
0.30 kgf(Min.) | 0.15 kgf(Min.) | |||
5-3 | Terminal/Housing Retention Force. | Apply axial pull out force at the speed rate of 25±3mm / minute on the terminal assembled in the housing. | 0.25kgf (Min.) | |
5-4 | Pin Retention Force | Apply axial push force at the speed rate of 25±3mm / minute | 0.25kgf (Min.) | |
5-5 | Durability | When mated up to 50 cycles repeatedly by the rate of 10 cycle per minute. | Contact Resistance 40mΩ (Max.) | |
5-6 | Vibration |
Amplitude: 1.5mm P-P Sweep time: 10-55-10 Hz in 1 minute Duration: 2 hours in each X.Y.Z. axes. (Based upon MIL-STD-202 Method 201A) |
Appearance No Damage. Contact Resistance 40mΩ (Max.) Discontinuity 1 μsec.(Max.) |
|
5-7 | Physical Shock | 490m/s²{50G},3 strokes in each X.Y.Z. axes. (Based upon JIS C0041/MIL-STD-202 Method 213B Cond. A) |
3, we can offer multiple, safe and fast shippment for you!
Various quick delivery way can be offered by us, then you can get our parts to test in a very short time. And it makes your work more effective. Let's work together, connect the world.