Arri 12v 2pin To Dtap Male Power Out Cable Circular Push Push Pull Connector
RM-FGG-0BC-302-JS52Z+ D TAP MALE
FGG straight circular push pull connectors with cable assembly to D TAP male. Cable length is according
customer real needs, 0.5m, 1m, 2m. We can make all types of cables as per customers' request.
Use any kind of connectors, like Hirose, Cannon, BNC, TNC, D-sub, USB, RJ45, Dtap, JST, Molex,
and so on. Just tell us your need, leave the rest to RAYMO!
CE, Rohs, Reach pass connectors
1. Push pull locking metal connector, cable to cable connector, free socket, inline connector
2. can be 100% compatible with original connector
3. can be with different degree , such us 30, 45, 60, 90, 135,
4. can plated with white or black chrome,
5. 360 angle screening for full EMC shielding.
6. ISO:9001-2015 CE RoHS2.0 SGS REACH
Temperature Range |
- 40° C, +125° C |
Resistance to vibrations |
15 g [10 Hz - 2000 Hz] |
Shell Material |
Brass with chrome plated |
Humidity |
up to 95% at 60° C/140F |
Shock Resistance |
100 g [ 6 ms] |
Salt spray corrosion test |
>96hr |
Climatical Category |
50/175/21 |
Shielding (min) |
> 75 dB [ at 10 MHz], > 40 dB [ at 1 GHz] |
IP Rating |
IP68 |
Endurance(shell) |
5000 mating cycles |
Why choose RAYMO Circular Connector :
A: Free cable solutions
B: 100% compatible lemo connector
C: OEM or ODM accepted
D: Help you save at least 50% cost, Bend relief of plug are free
E: Cable assembly offer
F: Free sample for confirmation
G: Fast delivery time to help you save prction time
Q1. Can I have a sample ?
Yes, we welcome sample order to test and check quality. Some samples are free, and some samples should be
paid in advance and the cost will be refund after further order.
Q2. What about the prction lead time?
We have stock, fast delivery below 5,000 pieces.
Q3. How do you ship the goods and how long does it take to arrive?
We often ship by DHL, UPS, FedEx,TNT,SF or EMS. It usually takes 3-5 days to arrive.
Q4. Is it OEM available?
Yes. We have rich experience and good ability to put your design and idea into real prct, normally it take
about 20 to 30 days for new prct from mold design to final prction.