Features:
Business Service | CNC machining part, CNC Turning Part, CNC Milling part, Grinding Part, Drilling part, CNC part, Precision part, etc. OEM and ODM part as per the customer's requirement. |
Processing Equipment | DMG 5 axis CNC machining center, DMG composite CNC machine, CNC turning, milling, drilling, grinding, wire EDM cutting, etc. |
Measuring& testing equipment | Coordinate measuring machine, Height Gauge, Hardness Tester, Projector, Microscope, Micrometer |
Material | Aluminum Alloy, Carbon Steel, Alloy Steel, Stainless Steel, Iron, brass, copper, bronze, etc. |
Surface Treatment | Sandblasting, polishing, Anodize, zinc/nickel/chrome/ plating, Power coating, passivation, Heat treatment, etc. |
File Formats | CAD(DXF,DWG), PDF,TIF , IGS , STP etc. |
Tolerance | +/-0.002mm |
QC | 100% inspection to make sure the products are 100% qualified |
Packing Information | Standard export package or as per customized specifications |
Lead time | 10-35days |
Application Industry | Mechanical components for engineering and construction, Aerospace, Medical device, Auto, Telecommunications, Defense parts & electronic processing Equipment parts, Motorcycles, railways, Marine Industry, etc. |
Light assembly services if needed.
Material | Aluminum, Carbon Steel, Stainless Steel, Brass, Copper, Bronze |
Surface treatment | Anodising, Zinc Plating / Galvanizing, Chrome plating, Case Hardening, Polishing, Sandblasting, Blackening, Electrophoresis coating, Powder coating, Temper, Heat treatment, Nitriding, Painting, Nickel plated, etc. |
Drawings for price | 2D drawing / 3D model |
Certification | ISO 9001:2015 |
MOQ | 1 Piece |
Tolerance | Generally +-0.02mm to +-0.05mm Strictly +-0.01mm to +-0.05mm |
Roughness | Ra 0.6-3.2 |
Inspection | 1. 100% QC quality inspection before delivery 2. Full dimension inspection report |
Packaging | 1. Standard: PE Foam, cartons/wooden case 2. Customized |
Lead time | 1. 1 to 50 pcs 7-10 days 2. 50 to 500 pcs 10-15 days 3. 500 to 1000 pcs 15-25 days 4. >1000 pcs to be negotiated Note: The accurated delivery date to be confirmed based on the drawings |