CNC Machining Center Custom Processing Aluminum Stainless Steel Large Machinery Equipment Parts Turning And Milling Processing Services
Aluminum
Material: 2024, 5052,5083, 6061,6061-T6, 6063,6082, 7075, etc.
Tolerance: +/- 0.01~0.002mm
Surface treatment: oxidation, electrophoresis,sandblasting, electroplating, chemical treatment, painting, hard anodizing, heat treatment, etc.
Stainless Steel / Steel
Material: SUS303,SUS304,SS316,SS316L,420,430,17-4PH,1214L/1215/4140/SCM440/40CrMo, etc.
Tolerance: +/- 0.01~0.002mm
Surface treatment: electroplating, galvanizing, spraying, oxidation, polishing, spray grinding, passivation, heat treatment, pickling,shot peening,etc.
Brass / Copper / Bronze
Material: HPb63, HPb62, HPb61, HPb59, H59,H62,H63,H65,H68, H70,H80, H90, C110, C120, C220, C260, C280, C360 etc.
Tolerance: +/- 0.01~0.002mm
Surface treatment: electroplating, tin plating, spraying, oxidation, polishing, spray grinding, heat treatment,pickling, shot peening,etc.

Custom CNC Machining Parts of Most Materials |
Tolerance | +/-0.005 - 0.01mm(Custonize avaiable) |
Surface Roughness | Ra0.2 - Ra3.2(Custonize avaiable) |
Materials Avaiable | Such as aluminum, copper, stainless steel, iron, PE, PVC, ABS, etc. |
Surface Treatment | Polishing, general/hard oxidation/oxidation, surface chamfering, tempering, , etc. |
Processing | CNC Turning, Milling, drilling, auto lathe, tapping, bushing, surface treatment, etc. |
Testing Equipment | CMM/Tool microscope/multi-joint arm/Automatic height gauge/Manual height gauge/Dial gauge/Roughness measurement |
Drawing Formats | 2D/(PDF/CAD);3D(IGES/STEP) |
Get a Free Quotation>>> Go |

FAQ
Q1:What's kinds of information you need for quotation?
VMT: You can provide 2D/3D drawing or send your sample to our factory, then we can make according to your sample.
Q2: Can we sign NDA?
VMT: Sure. We never divulge customers' information to anyone else.
Q3: Do you provide sample?
VMT: Yes, we can provide you sample before mass order.
Q4: How can you ensure the quality?
VMT: We have profesional QC department to guarantee the quality.
Q5: Delivery time
VMT: If in Stock: around 3 days after payment. Mass production: around 20~25 days after receipt of deposit (Accurate delivery time depends on specific items and quantities)
Q6: How about the transportation?
VMT: You can choose any mode of transportation you want, sea delivery, air delivery or door to door express.