Power 16KW Hot-wind Tempering Furnace for Wire Diameter 0.10-6.0mm
Machine Purchasing Process
• Customer provide HYD spring drawing
• HYD provide technical information for machine and spring making information
• Customer confirm machine and order,then arrange 30% deposit as PO confirmation
• HYD make spring set-up in machine after manufacturing period
• HYD shipped machine after customer’s spring confirmation and receive balance payment.
• Machine following for transposition and all after-sales service
FAQ
1. Q: What information will be helping to get an accurate quotation from us?
A: The customer should provide the related drawings, pictures, industrial voltage, planned output, technical requirements, etc
2. Q: What is the power supply of the machine?
A: The standard power supply in China is 380V, 3P, 50Hz. We also can customized as per requirement.
3. Q: What is the payment term
A: The payment term is 30% deposit as PO confirmation ,and 70% should be finished before the shipment.We also accept other payment term.
4 Q: What is the delivery time?
A: Normally the manufacturing time of the machine is 30 days after receiving deposit.But it depends on machine model.Some machine production can be finished within 15 days.
5. Q: What is the guarantee period of the machine?
A: The guarantee period is one year from the date of B/L.