Specifications
Brand Name :
SCRT
Model Number :
RT-OT010
Certification :
ISO
Place of Origin :
China
MOQ :
1 set
Price :
negotiable
Supply Ability :
200 per month
Delivery Time :
30 days
Packaging Details :
Wooden box
Application :
CNG station
Warranty :
18 month
Product name :
storage cylinder
after sales services :
Engineers available to service machinery overseas
Configuration :
stationary
Dimension :
customized
Color :
customized
Medium :
CNG
Description

Seamless structure CNG storage cylinder for CNG filling stations

Description:

The CNG storage cylinders consist steel racks and fittings. Fittings include hi-pressure stainless pipe, ball valves, HP joints and connectors, safety valve, pressure gauge and valves etc.

The cascade of different dimension could be manufactured as per buyers requirements

Features:

1. Heat-spinning technology, seamless structure, and realiable for safe operation.


2. Large-size structure, fewer valves, tubes and joints, and less danger of gas leakage.


3. Easily discharging of residue liquid.


4. Equipped with branch-tubes and accessories, easy for operation and maintenance.


5. Add additional gas-filling devices, energy saving and environment protection.


6. Applied to CNG.

Seamless CNG Gas Equipment For CNG Filling Stations Environment Protection

Technical parameters:

1 Cylinder manufacturing standard: BS5045
2 Water capacity: 50,80,120,167WL
3 iameter: 232mm
4 Working pressure: 25Mpa
5 Test pressure: 27.5Mpa
Send your message to this supplier
Send Now

Seamless CNG Gas Equipment For CNG Filling Stations Environment Protection

Ask Latest Price
Brand Name :
SCRT
Model Number :
RT-OT010
Certification :
ISO
Place of Origin :
China
MOQ :
1 set
Price :
negotiable
Contact Supplier
Seamless CNG Gas Equipment For CNG Filling Stations Environment Protection

Sichuan Rongteng Automation Equipment Co., Ltd.

Active Member
7 Years
sichuan
Since 1995
Business Type :
Manufacturer
Total Annual :
>110 millions
Employee Number :
700~800
Certification Level :
Active Member
Contact Supplier
Submit Requirement