Specifications
Place of Origin :
Shandong, China
Brand Name :
Future metal
Application :
Fluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, OIL PIPE, Chemical Fertilizer Pipe, Structure Pipe
Alloy Or Not :
Non-Alloy
Section Shape :
圆形
Thickness :
Customization
Standard :
BS,EN,GB,AISI,ASTM,DIN,JIS
Length :
12M, 6m, 6.4M, Client Requirement
Certificate :
ISO9001
Grade :
Ductile Iron Pipe, Carbon Steel
Surface Treatment :
Hot Rolled
Tolerance :
±1%
Processing Service :
Welding, Punching, Cutting, Bending, Decoiling
Oiled or Non-oiled :
Non-oiled
Invoicing :
by theoretical weight
Delivery Time :
8-14 days
Product name :
Ductile iron pipe
Type :
Seamless Round Steel Pipe
Keyword :
Carbon Seamless Tubes
Usage :
Construction Structure
Technique :
Hot Rollled
Shape :
Round.square.Rectangle
Payment terms :
L/C T/T (30%DEPOSIT)
MOQ :
1 Ton
MOQ :
5 tons
Price :
$680.00/tons 5-24 tons
Description
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
Specification
1
Standard:
ISO2531, EN545, EN598, etc
2
Size:
DN80~2600mm
3
Material:
Ductile Cast Iron GGG50
4
Pressure:
PN10, PN16, PN25,PN40
5
Class:
K9, K8, C25, C30, C40
6
Length:
6m, cut to 5.7m
7
Application:
Water supply project, drainage, sewage, irrigation, water pipeline.
8
Certificate:
ISO9001, CE, WRAS, BSI


9
Internal Coating:
a). Portland cement mortar lining
b). Sulphate Resistant cement mortar lining
c). High-Aluminum cement mortar lining
d). Fusion bonded epoxy coating
e). Liquid epoxy painting
f). Black bitumen painting

10
External Coating:
a). zinc+bitumen(70microns) painting
b). Fusion bonded epoxy coating
c). Zinc-aluminum alloy+liquid epoxy painting
11
Packing:
Bundles, in bulk
Product Details
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement

HIGH STRENGTH Nodular graphite is added to the ductile iron pipe during the casting process to make it have good strength and toughness.

STRONG CORROSION RESISTANCE The inner and outer surfaces of the pipe are coated with anti-corrosion coating, which has good corrosion resistance. lt can resist the erosion of acid, alkali, salt and other corrosive media, and prolong the service life of the pipeline.
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
GOOD SEALING PERFORMANCE The ductile iron pipe is connected by a rubber sealing ring, which has good sealing performance. This connection method can effectively prevent water leakage and seepage, and ensure the stable operation of the pipeline system.
Product Display
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
Application
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
Company Profile
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
Shandong Future Metal Manufacturing Co., Ltd. It is a large-scale enterprise integrating the production and sales of carbon steel,stainless steel, galvanized materials, aluminum and other metal products brands. It has formed 4 production and sales bases in Liaocheng, Wuxi, Tianjin, and Jinan, and cooperated with 4 steel pipe manufacturers to have more than 100 production lines, 4 nationally recognized laboratories, 1 Tianjin welded steel pipe technology engineering center, and 2 Liaocheng enterprise technology center. Products are exported to more than 50 countries and regions in North America, South America, Europe, Africa, Oceania, the Middle East, Southeast Asia and so on.
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
OUR CUSTOMERS Over the years, the company has established long-term and friendly cooperative relationships with customers all over the world. Many well-known buyers come to visit our factory every year, and our products have been recognized by them.
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
Customer's Review
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
Packing & Shipping
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
FAQ
Q1. Are you trading company or manufacturer ?
A: We are professional manufacturer, providing a wide range of steel products.

Q2. Do you provide samples ?
A: Yes ,we would provide samples. The courier freight will be covered by customer’s account.

Q3.what about the payment terms ?
A: We accept different payment terms like T/T, L/C , Cash, Western Union, online paying etc .

Q4.How about the delivery time?
A: Normally it takes 7-15 days since order confirmation.

Q5. Could you customized as our request?
A: Yes, just tell your demands, we can offer the customized solution for you, such as material, hardness, thickness,width and so on.

Q6.How can I visit your factory ?
A: Welcome to visit our factory at any time. We will help you accessing the business visa to China. Assist arranging your schedule in China ,including the factory visiting , products quality checking , car picking up, hotel booking , food service etc.
Send your message to this supplier
Send Now

High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement

Ask Latest Price
Place of Origin :
Shandong, China
Brand Name :
Future metal
Application :
Fluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, OIL PIPE, Chemical Fertilizer Pipe, Structure Pipe
Alloy Or Not :
Non-Alloy
Section Shape :
圆形
Thickness :
Customization
Contact Supplier
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement
High Construction Structure Water Supply Ductile Iron Pipe Length Client Requirement

Shandong Future Metal Manufacturing Co., Ltd.

Verified Supplier
1 Years
shandong, liaocheng
Since 2021
Business Type :
Manufacturer, Exporter
Total Annual :
2000000-5000000
Employee Number :
80~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement