Cold steel coil rotor flying cutting machine tube rolling mill production line
Introduction
An excellent sawing plan improves the quality of the workpiece, prolongs the sawing life of the saw blade, and speeds up the sawing speed. This is the first step for the metal products industry to improve product quality, improve production efficiency and reduce production costs in the production process.
material | Q195 Q235 SPCC | |
Cutting range | Round tube:MAX76mm | thick:0.5~3.5mm |
Square tube:MAX60×60mm | thick:0.5~3.5mm | |
Rectangular tube:MAX 40×80mm | thick:0.5~3.5mm | |
Production speed | 120m/min(length 6 meter,dia.≤25mm) | |
Cutting length | 1500-99999mm | |
Length tolerance | ±1.5mm(speed diviation not more than 2%); | |
Operation height | 750mm | |
Cutting burr height | Max:0.25mm; | |
Power supply | AC380V,3PH,50HZ |
Mechanical length | 5420*1380*1280mm(as per final drawing) | |
Motor list | Drive:18.5KW | PHASE servo motor |
feed: 3.3KW | PHASE servo motor | |
saw: 18.5KW | Siemens AC motor | |
Clamp | Pneumatic | |
Oil supply system | Auto oil filling | |
main shaft gearbox | Special made | |
Gear rack | KH from Chinese Taiwan | |
Equipment document | User’s manual & electrical diagram |
Features
1. The base of the equipment is equipped with feeding guide rollers (up and down, left and right rollers), the front end of the fixture is equipped with auxiliary guide rollers, and there are idlers at the final discharge position. All idlers contribute to the parallel movement of the pipe during sawing.
2. Both ends of the saw body are equipped with pulley safety buffers;
3. The saw blade is equipped with a steel brush device, which can remove iron filings on the saw blade when rotating;
Our service
1. Professional pre-sales consultation and after-sales service to help you find the best solution
2. Discuss technical details with our professional engineers
3. Strictly control the quality and production plan of the cold flying saw. You will be kept informed of any progress
4. Check the cold flying saw before shipment
5. After the warranty period, spare parts are provided at cost
6. Professional engineers help you increase production, reduce waste and reduce costs
7. Control the production progress and quality of the machine, and provide you with detailed information in time