120 Cubic Meter Mini Cold Storage Panels Assembling For Fruits And Vegetables
Quick details:
The operating system is stable and reliable with low failure rate and low noise.
Its high efficiency refrigeration system saves much electricity;With Gernay brand compressor which is forceful and has a long life span;
Different Temperature for Different Products:
Room function | Designed temperature range | |
°C | °F | |
Fresh food storage room | +5~0 | 41~32 |
Compatitive Advantages
· Life-long free online technical support service
20+ years of field experts, 15+ years of engineer
· Fast construction
Many years of exporting and oversea project experience
· Ecool cold storage are custom design project, customers could tell us your requirement and we delivery a turn-key project.
· Cold storage temperature range is large: -40º C ~ + 10C are available, user could adjust room temperature within designed range.
· We provide Intelligent remote-control model is available, for your convivence of remote control and getting remote technical support
· Our refrigeration machine are featured high reliability, good performance and low noise.Muilti-compressor unit could save energy up to 30%
Application
Restaurant, Farming, supermarket etc.
Steps of customized cold storage
Step | Contents | Details |
1 | Client describe the requests and using methods | 1. Client provides some basic requirements; |
2. Client provides relative information: | ||
1) construction address, environment, weather, geology conditions, electricity supply; | ||
2) storage purpose and functions; | ||
Other design requirements | ||
2 | We offer sketch design and pric | 1. Communication on details, discussion and modification until reach an agreement; |
2. sketch design; | ||
3. price offer on all systems | ||
3 | Contract and formal design | 1. Sigh the former design contract (if any); |
2. Site survey and measurement (if necessary); | ||
3. Formal design and delivery; | ||
4. Details of solution and price. | ||
5. Client prepare the construction site and foundation. | ||
4 | Equipment and material export | 1. Sign the contract of equipment and materials; |
2. production and export preparation | ||
3. Client prepare the on-site electricity and water | ||
5 | Installation | 1. working procedure confirm and team organization; |
2. Construction teams go to install. | ||
6 | Check and acceptance | 1. Our technicians trial run the cold storage on-site; |
2. Client check and make acceptance. | ||
7 | Operation instruction and warranty | 1. training clients’ cold storage operators; |
2. provide technical support within the lifetime of cold storage. |
Cold room pictures