Energy Saving Cold Food Logistics , XPS Board Refrigerated Storage Units
Cold Food Logistics Quick details:
Fruits storing temperature range:
Room function | Designed temperature range | |
°C | °F | |
Fresh keeping e.g. fruit, vegetable | -5 ~ + 10 | +23~+50 |
Compatitive Advantages :
Why Choose Ecool ?
1.High efficiency working team,reliable quality ,with rich experience technician and exporting team ,truly manufacturer,good service.
2.Cooperate with designing institute,can provide customer professional designing suggestions and drawings.
3.Help customers to do scheme configuration, such as : select compressor,cooler,evaporator,refrigeration,lighting and controlling system etc, provide customer a suitable cold storage configuration
4.Can provide quality report and related certifications according to different country.
Cold Food Logistics Application Fields:
Cargo distribution center,Logistics and Transfer center, e.g : Airport, railway station, Dock etc
Chain super market distribution center,online selling food distribution center etc
How to purchase a customized cold storage
Step | Contents | Details |
1 | Client describe the requests and using methods | 1. Client provides some basic requirements; |
2. Client provides relative information: | ||
1) construction address, environment, weather, geology conditions, electricity supply; | ||
2) storage purpose and functions; | ||
Other design requirements | ||
2 | We offer sketch design and pric | 1. Communication on details, discussion and modification until reach an agreement; |
2. sketch design; | ||
3. price offer on all systems | ||
3 | Contract and formal design | 1. Sigh the former design contract (if any); |
2. Site survey and measurement (if necessary); | ||
3. Formal design and delivery; | ||
4. Details of solution and price. | ||
5. Client prepare the construction site and foundation. | ||
4 | Equipment and material export | 1. Sign the contract of equipment and materials; |
2. production and export preparation | ||
3. Client prepare the on-site electricity and water | ||
5 | Installation | 1. working procedure confirm and team organization; |
2. Construction teams go to install. | ||
6 | Check and acceptance | 1. Our technicians trial run the cold storage on-site; |
2. Client check and make acceptance. | ||
7 | Operation instruction and warranty | 1. training clients’ cold storage operators; |
2. provide technical support within the lifetime of cold storage. |
Oversea Project Experience