Low Temperature Storage Cold Room Warehouse Freon R22 BOCK Compressor Unit
Cold Room Warehouse Quick details:
Cold Room Warehouse is for Gabon Logistics Company. The whole project was divided into two stages: the first stage had four cold chambers and was finished in 2012 and it working well now; the second stage was another four chambers which was started from the end of 2016 and finished in the beginning of 2017. All the building materials such as insulation panels and refrigeration system are all from China. The core construction team is from China too. This project is a single floor steel-structure building.
Cold Room Warehouse Details
Location:Libreville, Gabon | |
Function: | Low-temperature storage |
Design temperature: | -18℃~-25℃ |
Cold storage floor area: | 2767㎡ |
Ceiling height: | 6M |
Volume: | 16602 m3 |
System: | Freon R22 BOCK compressor unit |
Evaporator: | air cooled evaporator |
Condenser: | Evaporative condenser |
Compatitive Advantages
Panelcold storage are custom design project and very fast in construction.
Panel assembling cold storageTemperature range could be: -25º C ~ + 0º C are available
Functions: multiple e.g. Fresh-keep, freezing, frozen food storage
Intelligent remote-control model is available, for your convivence of remote control and getting remote technical support
High reliability, good performance and low noise machine
Refrigeration system could save energy up to 30%
Cold Room Warehouse Application
Logistics and Transfer center,cargo distribution center, super market distribution center
To build a cold room, and still have some questions as follows:
1. Store for fish, fruit, vegetable,..., but do not know the cold room size.
2. Want to see the design and graphic model of cold room.
3. Don't know how to choose the condensing unit and unit cooler.
4. Don't know how many cargos can be stored in the cold room.
5. How to deliver the goods to my warehouse.
Steps of our working process
Step | Contents | Details |
1 | Client describe the requests and using methods | 1. Client provides some basic requirements; |
2. Client provides relative information: | ||
1) construction address, environment, weather, geology conditions, electricity supply; | ||
2) storage purpose and functions; | ||
Other design requirements | ||
2 | We offer sketch design and pric | 1. Communication on details, discussion and modification until reach an agreement; |
2. sketch design; | ||
3. price offer on all systems | ||
3 | Contract and formal design | 1. Sigh the former design contract (if any); |
2. Site survey and measurement (if necessary); | ||
3. Formal design and delivery; | ||
4. Details of solution and price. | ||
5. Client prepare the construction site and foundation. | ||
4 | Equipment and material export | 1. Sign the contract of equipment and materials; |
2. production and export preparation | ||
3. Client prepare the on-site electricity and water | ||
5 | Installation | 1. working procedure confirm and team organization; |
2. Construction teams go to install. | ||
6 | Check and acceptance | 1. Our technicians trial run the cold storage on-site; |
2. Client check and make acceptance. | ||
7 | Operation instruction and warranty | 1. training clients’ cold storage operators; |
2. provide technical support within the lifetime of cold storage. |
Cold storage plan