6 X 4 Ready Mix Concrete Mixing Truck6-8m3 Front Discharge High Speed Left Drive
Introduction of concrete mixer truck 6-8m3
The concrete mixer truck primarily applicable to the concrete transportation and mixing , they can prolong transporting time and guarantee mixing and conveying quality.The main components such as the mixing drum and double-screw blades adopt wearing steel-plate materials. It is steady and reliable to slew, quick discharging, low residue rate, convenient operation, long life, etc. It is ideal essential advanced equipment for concrete plant or mixing station without pollution to the road.
Features of Concrete Mixer Truck 6m3 and 8m3
1. It is economical and practical, with convenient operation ,uniform mixing and stable performance,and is suitable for bridge,tunnel,highway and urban&rural construction.
2. Advanced method of fetching force maintains the power source of drum,and makes concrete keep concrete a good uniformity,without deposition. Scientific blade design maintains quick discharging and low discharge residual percentage;double-side control platform is free from limitation of working floor,with convenient operation.
3. There is no impact on highway condition when carrying out field operation,requirements of narrow highways can be met.
Parameters of Self-loading Concrete Mixer Truck 6-8CBM
Item | 6m³ | 8m³ | |
Chassis System | Brand | Dongfeng | SINOTRUK |
Chassis Model | 4*2 | 6*4 | |
Engine Power | 140HP | 220HP | |
Emission standards | EURO V | EURO V | |
Service brake | Air brake | Air brake | |
Drive | Left | Left | |
Dimension | 7.3 ×2.35× 3.55m | 8.1× 2.7× 3.86m | |
Mixing Drum System | Geometric volume | 9.6m³ | 11.8m³ |
Mixing volume | 6m³ | 8m³ | |
Feeding speed | ≧3m³/min | ≧3m³/min | |
Discharging speed | ≧2m³/min | ≧2m³/min | |
Hydraulic System | Reducer | Keyi | Keyi |
Hydraulic motor | BMS50-250 | BMS50-400 | |
Raditator | 18L | 18L | |
Water System | Supplying model | Air pressure supply | Air pressure supply |
Water tank volume | 350L | 350L |
FAQ
1. According to your inquiry, We will reply to you in 24 hours.
2. Best Aftersales: We will send the technical personnel to the site for installation, commissioning and training work.
3. Warranty period 12 Months, in addition to the force majeure and man-made factors, the damage caused by design, process and manufacturing equipment, the seller is responsible for sending people to offer free repair.
4. We will send the spare parts as soon as possible when necessary, equipment repair parts provided by the seller are original, authentic, quality goods.
How could I select concrete mixer trucks suitable for my company?
In construction site and on the road, we often see the figure of the concrete mixer truck. For the concrete mixing and transmit of our house construction, its contribution is indispensable. The concrete mixer trucks are also called as concrete transit mixer truck according to the function. The construction engineers need to consider the following points in selecting such engineering equipment.
1. The pouring elements
The selection of the concrete mixer truck should be considered in accordance with the project object, characteristics, and the required maximum transport distance, construction plan and specific conditions.
2. Type and structure of the building
The performance of the concrete mixer trucks is different depending on the models. When selecting the model, besides of the pouring amount, the type and structure of the building, construction technical requirements, site conditions and environment should also be considered. Generally, the main performance parameters of the selected concrete mixer truck should be consistent with the construction requirements or slightly larger. If the capacity is too large, the utilization rate is too low, if it is too small, it not only can not meet the requirements, but also will accelerate the loss of the concrete truck mixer.
3. Construction business volume
The number of concrete mixer trucks used can be calculated based on the amount of pouring, the actual delivery volume of the single vehicle and the construction work time.