Model | YHZS25 |
Capacity | 25m3/h |
Max. dragging speed | 40km/h |
Discharging height | 3800mm |
Concrete mixer | JS500 |
Discharging volume | 500L |
Charging volume | 800L |
Mixing circle | 72s |
Max. mixing size | 80/60mm |
Batching machine | PLD800 |
Storage bins quantity | 2 or 3 or 4 sorts |
Aggregate scale hopper | 800L |
Aggregate feeding method | Skirt-side Belt conveyor |
Weighing precision | ±1%(water, cement, additive) |
1. The mobile concrete plant discharge height is 3.8m, and it can mix various types of concrete;
2. With the loader to feed material, it can store four types of aggregates at the same time and also with two cement silos and their respective screw conveyor;
3. With electronic scales to measure and the mixing host is twin-horizontal-axis type;
4. Electrical system is equipped with IPC, printer and so on to realize the centralized control and overall management;
5. With the functions of real-time display, information storage and automatically equalizing the fall during the production process;
6. The mobile concrete batching plant can be controlled by computer and manually, and then can be easily converted through the switch;
7. The modular design is convenient for the containerized transport; Simple structure, easy in installation and maintation.
8. With the optimized design of the concrete batch plant, it can be overall transferred by the towing vehicle.
9. 30%-40% higher efficiency than average level.
1. High Uniformity: The double horizontal shaft mixing system is specially designed to improve the strength and uniformity of concrete, no deposition or segregation.
2. High productivity: The reasonable matching of proportioning system and
conveying system ensures the mixing plant to achieve its ideal productivity.
3. Reliable and convenient operation: Dual-computer control system, auto/semi-auto/manual switchable.
4. Environment Friendly: The powder is in a closed condition during the conveying and weighing process. Both the mixing plant and the powder silos are equipped with imported dust collectors to improve dedusting efficiency.
1. Installation, debugging, operators trainning;
2. maintanence:
A. when trainning your operators, our engineers will give them advice on how to operate the machines correctly;
B. we will send you the operation manual which can help you operate the machins properly, it can also help you to solve the common problems;
C. Call us at any time if you have problems about our concrete plants;
D. If needed, we will send engineers to your site to solve your problems.
3. Providing some documents needed for your customs clearance, like commercial invoice, packing list, certificate of origin etc;
4. Spare parts supply.