1,Regular checks of the motor surface health.
2,There are dust affect the cooling timely clean-up.
3,Regular checks of motor mounting bolts of the foot is loose.
4,Loose fastening with a torque wrench to the required torque.
5,Check whether abnormal vibration.
1,Abnormal vibration downtime , apart eccentric block guard check processing.
2,The eccentric block shield seal is strict, Stop processing when Mifengbuyan Seal is lax.
3, If the motor outlet View cable for wear,If wear , downtime processing.
4 Bearing is short of oil or not, If lack of oil , in a timely manner to add.
1. If you have ever used the motor,please give me the model number directly.
2. If you have not used the motor,Please confirm the questions as below:Power,Exciting force,Number of poles,The size of installation.how many sets.Voltages and hertz.
No. | Model | Force(KN) | Power(KW) | Weight(KG) | Installation Size | |
A | B | |||||
1 | MV40/3 | 0.3 | 0.05 | 4 | 62-74 | 106 |
2 | MV60/3 | 0.7 | 0.07 | 4.2 | 62-74 | 106 |
3 | MV100/3 | 1 | 0.09 | 4.6 | 62-74 | 106 |
4 | MV200/3 | 2 | 0.15 | 6.8 | 62-74 | 106 |
5 | MV300/3 | 3 | 0.25 | 9.8 | 90 | 125 |
6 | MV400/3 | 4 | 0.27 | 10.3 | 90 | 125 |
7 | MV500/3 | 5 | 0.5 | 15.8 | 105 | 140 |
8 | MV700/3 | 7 | 0.59 | 16.5 | 105 | 140 |
9 | MV800/3 | 8 | 0.7 | 20.6 | 120 | 170 |
10 | MV1200/3 | 10 | 0.95 | 21.6 | 120 | 170 |
11 | MV1300/3 | 13 | 1.3 | 24.5 | 120 | 170 |
12 | MV1600/3 | 16 | 1.54 | 51.6 | 140 | 190 |
13 | MV1800/3 | 18 | 1.85 | 52 | 140 | 190 |
14 | MV2000/3 | 20 | 2.1 | 51.8 | 140 | 190 |
15 | MV2200/3 | 22 | 2.4 | 52.8 | 140 | 190 |
16 | MV2300/3 | 23 | 2.4 | 53.6 | 140 | 190 |
17 | MV3200/3 | 32 | 2.76 | 96.9 | 155 | 255 |
18 | MV4000/3 | 40 | 2.9 | 107 | 155 | 255 |
19 | MV5000/3 | 50 | 4 | 112 | 155 | 255 |
52 | MV60/3M | 0.7 | 0.08 | 4.5 | 62-74 | 106 |
53 | MV100/3M | 1 | 0.1 | 5.1 | 62-74 | 106 |
54 | MV200/3M | 2 | 0.13 | 6.8 | 62-74 | 106 |
55 | MV50DC-24 | 0.5 | 0.1 | 4.5 | 62-74 | 106 |
56 | MV200DC-24 | 2 | 0.16 | 6.5 | 62-74 | 106 |
We provide 12months quality warranty to make sure your machine well runs consistently.
a. Professional engineer design the production line for you.
b.Recommend suitable equipment according to your special demand.
a.Precheck and accept products befor edelivery.
b.Send technicians to the jobsite for guiding the installation and adjustment.
c.Training operators and finishing the check to satisfy your requiremnet
a.Common problem can be solved through web in 24 hours,complex problem can be reacted immediately in 24 hours and solved as soon as
possible.
b.To establish long-term friendship, we will regulary contact with our customers.