1. Concrete Blocking Making Foaming Machine combines feeding machine, water adding device, mixing system, foaming system, delivery system together.
2. It is convenient to operate, automatic cement feeding, automatic mixing of cement slurry, automatic foaming of foaming agent, automatic delivery of foaming concrete.
3. The machine adopts high pressure foaming technology with good foaming performance,even,high quality,unbreakable,accurate(foaming amount can be precisely controlled within mg).
Items | Unit | KFP-65-40A foam concrete machine |
Main motor | KW | 7.5 |
Output | m3/h | 10~12 |
Vertical delivery dist. | m | 40 |
Horizontal delivery dist. | m | 200 |
Particle size | mm | ≤15 |
Max. air pressure | Mpa | 3.0 |
Output pressure | Mpa | 1.5 |
Dimensions (length*width*height) | mm | 1800*1200*1500 |
Main machine weight | Kg | 1300 |
Mixer dimensions | mm | 1600*800*1300 |
Mixer weight | Kg | 150 |
Concrete Blocking Making Foaming Machine Application:
1. Concrete Blocking Making Foaming Machine combines feeding machine, water adding device, mixing system, foaming system, delivery system together.
2. It is convenient to operate, automatic cement feeding, automatic mixing of cement slurry, automatic foaming of foaming agent, automatic delivery of foaming concrete.
3. The machine adopts high pressure foaming technology with good foaming performance,even,high quality,unbreakable,accurate(foaming amount can be precisely controlled within mg).
FAQ
---Cement Pump, Mortar Pump, Mud Pump
1. Q: Which pump model should we choose?
A: To recommend the most suitable model, please tell us:
- Material: composition, max aggregate size
- Capacity (-m3/h) :
- Delivery distance (horizontally / vertically):
- Grouting pressure:
- Driven type: electric motor, diesel engine, pneumatic motor
2. Q: Do i need technical skills to operate this machine?
A: Yes. Please read the Operation Instruction for some basic technical skills before operating this machine, and contact us if any operation procedure is unclear.
3. Q :How to pay for this order?
A: Generally, TT, 30% deposit 70% before shipment;
L/C at sight (high bank charge, not suggest, but acceptable);
100% TT in advance (especially for small amount and spare parts etc.)