Heavy Duty 35-50KN Construction Post Supports Push Pull Scaffold Prop Formwork Props
Adjustable steel props provide the most economic method for supporting to all kinds of shuttering work and formwork. Steel Prop is a labor and time saving device to support shuttering and formwork. Scaffold cup nut shoring prop is widely application in propping system such as construction, plants. We can produce different kinds of steel props as the customer’s requirement which can save your time and money at the same time.
Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs. Welcome new and old customers contact us for construction materials.
Specification of Heavy Duty 35-50KN Construction Post Supports Push Pull Scaffold Prop Formwork Props:
Heavy Duty Construction Post Supports Push Pull Scaffold Prop Formwork Props | |||||
Adjustable length | Outer Tube | Inner Tube | Top & Base Plate | Loading | Surface |
1700 - 3000 mm | 60 x 1.8 mm | 48 x 1.8 mm | 120 x 120 x 4 mm | 35-50KN | galvanized |
2000 - 3600 mm | 60 x 1.8 mm | 48 x 1.8 mm | 120 x 120 x 4 mm | 35-50KN | galvanized |
2200 - 4000 mm | 60 x 1.8 mm | 48 x 1.8 mm | 120 x 120 x 4 mm | 35-50KN | galvanized |
Features of Heavy Duty 35-50KN Construction Post Supports Push Pull Scaffold Prop Formwork Props:
Related accessories of Heavy Duty 35-50KN Construction Post Supports Push Pull Scaffold Prop Formwork Props:
We also supply scaffold frame, steel plank, steel prop accessories, fomwork tie rod, jack base, etc, please feel free to contact us for construction materials, we will reply soon.
FAQ:
1: Could you provide sample?
A: Yes,we can provide sample together with our catalogue.
2: What information should I provide,if I want a lowest quotation?
A: The specifications of wire diameter. length, quantity, packing, etc.
3: How does your factory do regarding quality control?
A: We are very proud to let you know that, we use the best raw material,have at least 5 years experienced workers, the advanced
machine and specialized team to assure the quality.
We perform Quality Control Inspections on 100%of our products.
4: How is your delivery time?
A: We always prepare enough stock material for your urgent requirement.The delivery time is 7days for all the stock material. We
will check with our production department for the non-stock items to offer you the exact delivery time and producing schedule.
5:What's your payment term?
A: We usually use the T/T,L/C,D/P,Western union.