SHANTUI Road Roller / Motor Grader Power Switch Parts For SR20M CE ISO
SHANTUI Road Roller Parts Power Switch D2602-05000 For SR20M Road Roller
Quick Details:
Part No. | D2602-05000 |
Name | power switch |
MODEL | SR20 |
Weight | ABOUT 0.4kg |
type | original or OEM |
Warranty Time | Six Months |
Certificate | CE, ISO |
MOQ | 1 pcs |
MAX | 10000 |
Delivery time | in stock |
Package | standard export package: pallet, carton , wooden case or as requests. |
Competitive SHANTUI Parts:
1. SHANTUI bulldozer excavator road roller motor grader wheel loader whole machines
2. Undercarriage Parts, track shoe ass’y, track link ass’y, front idler, track roller, carrier roller, sprocket.
3. Torque Converter Assembly and Transmission Assembly
4. End bit and cutting edge
5. Pump, valve and cylinder series
6. Engine parts (Camshaft, Crankshaft, Connecting Rod, Cylinder Liner, Piston, Piston Ring and Piston Pin.)
Advantages:
1: Genuine and original SHANTUI parts
2: Full series SHANTUI spare parts
3: Large stock in warehouse
4: Best competitive price
5: Genuine SHANTUI package
6: Fast delivery time
Packaging & Shipping
Export standard Plywood box packing (water proof,damp proof and mould proof and fumigation-free).
About delivery
WEIGHT | RECOMMENDED TRANSPORT MEANS | TRANSPORT TIME | COMMENTS |
<50kg | express- | 3-7 days | fast |
UPS/DHL/FEDEX | convenient | ||
door to door service | expensive | ||
50-150kg | by air | 3-10 days | fast; |
economic; | |||
consignee has to do customs clearance | |||
150>kg | by sea | 10-50 days | slow; |
economic; | |||
it takes some time for customs declarance and clearance | |||
2x20' or 1x40' | by rail | 20-35 days | slow; |
economic; | |||
it takes some time for customs declarance and clearance; | |||
only full container load accepted( MOQ:2x20' or 1x40' ) |
Service commitment
<1> Warranty
Q: There are so many suppliers from China, how to identify the quality?
A: All parts that we sell enjoy 3 to 12 months warranty; if any parts breaks during warranty, just offer us the proof. We'll resend you new one!
<2> Delivery
Q: What if parts we order from you are lost during delivery?
A: We'll resend the parts!
<3> Price
Q: Why your price is so high?
A: You get what you pay for.
There is no winfall profits at all in the open market. We just insist resonable profits.
We offer genuine parts and replacement parts as your request.
<4> Lead time
Q: How many days it takes before you deliver the goods to us?
A: We have most easily-damaged parts in stock, for small goods, we could deliver you the goods after order confirmation and receving the payment; for large quantity, we need 1 or 2 more days to order wooden box or pallet, 2-3 days to book flight/vessel and deliver the goods to named port/airport.