The coiled tubing provided by Tiptop meets the highest industry standards and can replace many conventionally operated pipelines. It can be used in a variety of industrial applications, such as milling, drilling, rock fracturing, sidetracking, production tubing, low bottom pressure drilling, wellbore cleaning, nitrogen injection, sand control, cementing, mechanical isolation, logging and perforation. The length of a coil of coiled tubing can reach several kilometers. When it is used, people will wrap it on the spool and straighten it, then push it into the wellbore, and then rewind it to the spool for transportation and storage. We can provide steel grades of CT70, CT80, CT90, CT100, and CT110.
Grade | Max. C | Max. Mn | Max. P | Max. S | Max. Si |
CT70 | 0.16 | 1.2 | 0.025 | 0.005 | 0.5 |
CT80 | 0.16 | 1.2 | 0.02 | 0.005 | 0.5 |
CT90 | 0.16 | 1.2 | 0.02 | 0.005 | 0.5 |
CT100 | 0.16 | 1.65 | 0.025 | 0.005 | 0.5 |
CT110 | 0.16 | 1.65 | 0.025 | 0.005 | 0.5 |
Mechanical properties of carbon steel and low alloy steel coiled tubing
Grade | Min. Yield Strength | Max. Yield Strength | Min. Tensile Strength | Max. Hardness HRC | |||
Psi | Mpa | Psi | Mpa | Psi | Mpa | Tube Body&Seamless | |
CT70 | 70,000 | (483) | 80,000 | 552 | 80,000 | 552 | 22 |
CT80 | 80,000 | (552) | 90,000 | 620 | 88,000 | 607 | 22 |
CT90 | 90,000 | (620) | 100,000 | 689 | 97,000 | 669 | 22 |
CT100 | 100,000 | (689) | 108,000 | 758 | 28 | ||
CT110 | 110,000 | (758) | 115,000 | 793 | 30 |
FAQ
Q1: Can you arrange the shipment?
A: Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.
Q2: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 25-45 days if the goods are not in stock, it is according to quantity.
Q3. Can you provide customize service?
A: Yes.Pipes can be customized as per the customers' request.
Q4. How to ensure the quality?
A:Mill Test Certificate is supplied with shipment.
If needed, a Third Party Inspection is acceptable.