Introduction to the Detailed Operation of Portable Stainless Steel Welding Machine
1. Preparation Work
Equipment inspection: Before using the portable stainless steel welding machine, ensure that the appearance of the equipment is undamaged and all components are firmly connected.
Power connection: Connect the welding machine to a stable power socket and ensure that the voltage meets the equipment requirements.
Preparation of welding materials: Prepare the stainless steel workpieces that need to be welded, and ensure that the surface is clean, free of oil and impurities.
2. Parameter Settings
Current adjustment: According to the thickness of the stainless steel and the welding requirements, set the appropriate welding current through the current adjustment knob on the equipment. Thinner stainless steel requires a smaller current, while thicker ones require a larger current.
Welding time setting: Set the corresponding welding time according to the length and depth requirements of the weld seam.
3. Welding Operation Steps
Wear protective equipment: Wear protective gloves, goggles, etc. to protect the safety of the operator.
Position the workpiece: Place the stainless steel workpiece to be welded accurately at the welding position, ensuring alignment and fixation.
Start the welding machine: Press the start button and the welding machine starts to work.
Perform welding: Align the welding gun tip with the weld seam and move evenly to ensure uniform welding.
Welding completion: When the set welding time is reached, the welding machine will automatically stop working.
4. Precautions
Good ventilation: Ensure good ventilation in the operating environment to discharge the smoke and gas generated during the welding process.
Regular maintenance: Regularly check the wires, plugs and welding gun tips of the equipment. If there is any damage, replace them in time.
Avoid overload: Do not use the welding machine continuously for a long time to avoid damage due to overload of the equipment
.
Q1: How to select the suitable machine?
Tell us your material, detail requirements by words, pictures or video.We will recommend you the suitable model with the reasonable price.
Q2: How about the lead time?
For the standard machine, the delivery time is 3-7 days afte the payment.For the non-standard machine, the delivery time is 7-15 days after the pay-ment.
Q3:How to install and use it?
We have the instruction Book, Operational manual and Training Videoinside the machine.
We also can provide the training on line by free.
Q4:How to do it if we meet the issue during the operation?
You can send the wrong informationtous by mail, we can help us solveit by mail.
phone, or video communication.
Q5: If we want to learn how to operate the machine, Can you provide it?Yes, we can. We can provide the online training by video.We also pro-vide free training
course in our company.
Q6:Do you provide the onsite service if we needed?
Yes. We can provide the onsite service if you needed. But need the cus-tomer pay for the transport, hotel, catering expenses and the daily salary.