The type cooling tower filler is made from PVC injection molding under high pressure,it has special structure form ,not only certain stiffness,but some flexibility. Due to good elasticity,the filler would chatter under the water-drop impact effect lead to some water-drop rebound to above for the water redistribution.
Prolong the residence time in the water in the packing,For heat and mass transfer, thereby increasing the, improved the packing heat dissipation effect.
Tech Date | |
Sheet Width(mm) | 730/750/930/950mm |
Sheet Length | 2000/1800/customized |
Thickness | 0.32-0.6mm/customized |
Sheet Spacing | 19-20mm |
Color | grey/white/black |
Material | PP/PVC/CPVC |
Cooling tower fill manufactured from rigid PVC sheets conforming for cooling tower heat-transfer applications. The media is fabricated from corrugated PVC sheets that are solvent-welded for maximum strength and resistant to UV, rot, fungus, organic and inorganic solvents, acids, alkalis and chemicals normally found in cooling tower waters. Available in various mil thickness and heights, especially designed to meet the distinct needs of your particular application, whether that is new construction,emergency repair, thermal upgrade or reconstruction.
1. Manual cleaning of the slag falling off in the cooling tower;
2. Rinse the packing repeatedly with a high-pressure water gun to remove the sludge and scale under cleaning;
3. Dissolve the TNB descaling agent with hot water at about 50°C, and then use the flushing pump to rinse the filler repeatedly until the scale is rinsed off (if the filler has a long service life, causing aging and collapse, it is recommended to replace the filler), and add algaecide at the same time. Completely kill biological algae and;
4. After confirming that all parts of the system are cleaned, drain the sewage;
5. Rinse the packing and the inside and outside of the tower body with clean water;
6. Restore all parts of the system, replenish water and use it;
7. After all recovery, please check and accept the management personnel of Party A;
8. Evacuate Party B's belongings and clean the site;