MX fill incorporates highly efficient cellular drift eliminators, integrally molded within the fill sheets. Compared with previous designs, these eliminators reduce drift emissions from the tower by a factor of ten or more! Less drift means tower owners save water bills and water treatment chemical expenses.
This fill virtually eliminates the nuisance caused by drift spotting on adjacent buildings and property. For additional savings, the drift eliminators discharge air directly toward the fan. Discharge air, traveling in the right direction when it leaves the eliminators, translates to lower fan horsepower.
Louvers are also integrally molded within the fill sheets preventing water from escaping and assuring precise air distribution throughout wide variations in airflow. Unlike towers equipped with separate external louvers, this fill operates virtually ice-free even in extremely cold weather.
MX fill is thermoformed from PVC with a flame spread rating less than 25 per ASTM E-84 and is considered selfextinguishing. Therefore, the risk of fire damage is minimal.
We have many years for exported Cooling towers filling, we are professional for installation and production.
Tech Date | |
Sheet Width(mm) | 760/820/920/1020/1220/1530-1510mm |
Sheet Length | 206MM*N(N=4,5,6,7,8,9,10,11,12......)/customized |
Thickness | 0.32-0.6mm/customized |
Sheet Spacing | 19-20mm |
Color | grey/white/black |
Material | PP/PVC/CPVC |
Water temperature | -35~70℃ |
Tensile Strength | 6,300 psi(at room temperature) |
Tensile Modulus | 325,000 psi |
Cooling tower packing cleaning method:
1. Manual cleaning of the slag falling off in the cooling tower;
2. Rinse the packing repeatedly with a high-pressure water gun to remove the sludge and scale under cleaning;
3. Dissolve the TNB descaling agent with hot water at about 50°C, and then use the flushing pump to rinse the filler repeatedly until the scale is rinsed off (if the filler has a long service life, causing aging and collapse, it is recommended to replace the filler), and add algaecide at the same time. Completely kill biological algae and;
4. After confirming that all parts of the system are cleaned, drain the sewage;
5. Rinse the packing and the inside and outside of the tower body with clean water;
6. Restore all parts of the system, replenish water and use it;
7. After all recovery, please check and accept the management personnel of Party A;
8. Evacuate Party B's belongings and clean the site;