Forged 1/2''X1/2'' 90 Degree Copper Pipe Elbow
Copper Pipe Elbow Introduction
The Push-Fit connection system is really taking hold. It's the easiest way to join copper, CPVC or PEX pipe in any combination
with no soldering, clamps, unions or glue. Just insert the pipe and the stainless steel teeth bite down and grip tight, while a specially formulated O-ring compresses to create a perfect seal. Disassembly is just as fast using the simple disconnect tool. So fittings and valves can be easily changed and reused. They can even be rotated after assembly for easier installation in tight spaces. Get a grip on your next plumbing project.
Instant Push-Fit connection for increased ease-of-use.
No soldering, clamps, unions, or glue required.
Fittings certified to 200 PSI and 200°F (93°C).
Fits copper tubing, and CTS CPVC and PEX and connects all three types in any combination.
Integral tube liner for PEX installations, sono loose components, ensures secure, reliable connection.
Design certified and agency listed.
Copper Pipe Elbow Specification:
Specification | Parameter | ||||
Name | Forged 1/2''X1/2'' 90 Degree Copper Pipe Elbow | ||||
Applicable medium | Compressed Air, Vacuum | ||||
Pressure range | 0~1.0 MPa | ||||
Proof pressure | 1.5 MPa | ||||
Negative range | -100kpa (10Torr) | ||||
Temperature range | 5°C~60°C | ||||
Applicable tube | PU hose, Nylon hose, PE hose |
Pictures
Installation
Select the correct size fitting and pipe for the job. Check that fittings and pipe are clean, in good condition and are free from damage and foreign objects.Cut the pipe so that the ends are square.Ensure that there are no burrs or damage to the cut end.Once the pipe end is cut square and clean,use a permanent marker to mark the insert depth on the outside of the pipe.This mark is used to ensure that the joint is assembled correctly.To assemble correctly,the pipe needs to be pushed into the fitting untill it meets the tube stop.Follow these three steps to insert the pipe into the fitting.
1.lnsert the pipe through the release collar against the grab ring.
2.Push the pipe firmly with a slight twisting action until it reaches
the tube stop.
3.To ensure that the pipe is correctly inserted, check that the depth
mark is within 0.005 in (0.13 mm) of the end of the release collar.
Disconnection of the joint can only occur by using the PUSHLOCK removal tool.By applying pressure to the release collar with the re-
moval tool, the grab ring teeth are splayed.This action releases the pipe, allowing it to be removed from the fitting.
1.Place the PUSHLOCK removal tool around the pipe with the non-
branded face against the release collar.The end with the size dis-
played on the removal tool should be positioned around the pipe and
the other end around the neck of the fitting.
2.Push the removal tool against the release collar and pull the pipe
with a twisting action to release the pipe.
3.Check the fitting and pipe end for damage.The fitting and pipe
should be free of damage, foreign objects and marks on the outside
diameter. If the pipe is damaged or marked, then cut and use a new
section of pipe.
about us
Originally founed in1983,TaiZhou JinQuan Copper Inc. is one of the leading
manufacturer of lead free plumbing valves&fittings, mainly serving plumbing
wholesalers,distributors and retailers.
We are currently supplying lead free PEX fittings&Valves,push-fit fittings&Valves,
Various water supply stops and water connectors etc.All products are made of
lead-free with DZR functional brass,and have been certified and listed by IAPMO.
Our goal is to help our customers to increase their profitability and gain more market
share by taking advantage of our extremely competitive price and quality.
FAQ
Q: Can l get samples from your factory?
A:Samples available,We usually provide existing sample for free.But Express Fee is needed.
lf you have UPS/DHL... account,We can use your account.For existing samples, it takes 1-2 days.
lf you need your own designs, it will takes 7-10 days,Cause we need make new MOULD.
Q: What is your MoQ? Can l order small amount ?
A:Usually our MOQ is 1,000pcs.To take a good start,We accept any quantity for your trial order.
Pls feel free to tell us which Item,Size,Quantity, So that we can make Pl for you,
Wish your business boom and place larger orders in the future.
Q: What is your payment term?
A: Normally,T/T 30% down payment,balance to be paid before shipment.or L/C.
After cooperate 2-3 times,We will know each other,Will cosider your ideal payment term then.
Q: What is your delivery time?
A:Generally,15days after receipt of the deposit or L/C lf bulk quantity,45days.