150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig
XY-150 is a portable and multipurpose engineering exploration drilling rig, applicable to the engineering geological exploration in fields of industrial and civil buildings, railways, bridges, hydropower engineering, as well as small-diameter foundation pile hole drilling.
1. Large torque, multiple drilling speeds in an appropriate range.
2. With 2-wheels trailer, the rig can be moved by towing the trailer.
3. Capable to drill inclined holes at different angle.
4. High efficiency drilling with hydraulic feeding structure.
5. Multiple usages, geotechnical investigation for engineering constructions, SPT soil test, mineral exploration, small size pile hole, water well boring.
The technical parameter of the XY-150T Drilling Rig:
Basic Parameters | |
Drilling depth | 45-180m |
Drilling diameter | 300-76mm |
Drill pipe diameter | 42mm 50mm AW BW AWJ BWJ |
Gross weight of drilling machine(engine not included) | 500kg |
Dimension (length ×width × height) | 2050 × 1180× 1420 mm |
Revolving Plate | |
Rated speed | 60 200 400 610 1100 r/min |
Maximum torque | 1800N*m |
Driving travel | 450mm |
Maximum Cylinder driving force | 20KN |
Maximum Cylinder lifting force | 30KN |
Lifter | |
Lifting capacity | 24KN |
Bobbin line speed (2 layers) | 0.20 0.72 1.26 2.8 m/s |
Bobbin diameter | 125mm |
Rope diameter | 11mm |
Rope capacity | 26m |
Oil pumps: | |
Displacement: | 20ml/r |
Normal speed | 2500r/min |
Normal pressure | 20MPa |
Max pressure | 25MPa |
Drive motor | |
Type | Changchai ZS1105 diesel engine |
Rated power | 13.2KW |
Rated speed | 2200r/min |
weight | 163kg |
Frame | |
Type | Sliding type(with base frame) |
Movable travel of drill | 400m |
Distance between drill and hole-opening | 280mm |
Safety hazards of drilling rigs
1. When conducting standard penetration tests, the operator must keep their hands away from the probe when the centrifugal hammer falls freely to prevent the probe from falling off and injuring the operator.
2. When the drilling rig is in operation, on-site personnel must wear safety helmets and personnel unrelated to the operation must not approach the drilling rig to prevent the top fasteners of the drilling rig tower from falling and injuring them.
3. During the operation of the drilling rig, always pay attention to the mud pump behind the rig. If the mud pipe ruptures or the drill pipe is blocked during high-pressure operation, it may cause mud spraying and injure on-site personnel.
4. Before starting work, it is necessary to check whether there are any safety hazards in the steel wire rope on the winch and the fasteners of the elevator, in order to prevent the steel wire from breaking and the fasteners from falling off when lifting the probe rod, which may harm the on-site operators.