Hydraulic drilling rig, core drilling rig, soil investigation drilling rig, survey drilling rig, mining drilling rig, water well drilling rig, core drilling equipment
The XY-4 core drilling rig is the first generation vertical axis diamond drilling rig in China. It has advanced design, reasonable layout, compact structure, flexible operation, durability, good disassembly, and is easy to relocate and repair.
The XY-4 drilling rig is a mechanical transmission hydraulic feed core drilling rig that can drill 1000 meters of holes with a 42mm drill rod. Mainly used for diamond and alloy drilling of solid mineral deposits on the surface and in tunnels, it can be used for engineering geological exploration and groundwater exploration, shallow oil and gas exploration, dam injection, tunnel ventilation, drainage drilling and other engineering hole drilling.
The XY-4 drilling rig is equipped with an automatic centering hydraulic chuck, a planetary winch with strong lifting and pulling capabilities, and a clutch that is easy to operate and reliable to use
The XY-4 drilling rig has the following characteristics compared to general hydraulic drilling rigs:
1. The drilling rig has a high speed and a reasonable speed range, with multiple speed stages and high low-speed torque, suitable for small-diameter diamond core drilling rigs, as well as meeting the requirements of large-diameter hard alloy core drilling and various engineering drilling.
2. The drilling rig is lightweight and has good disassembly. The drilling rig can be disassembled into nine integral components, with the largest component weighing only 218 kilograms. Easy to relocate and suitable for working in mountainous areas.
3. The structure is simple and the layout is reasonable, with all components exposed and not overlapping with each other, making it easy to maintain, upkeep, and repair.
4. The drilling rig has two reverse speeds, which reduces labor intensity and ensures safety when dealing with accidents.
5. The drilling rig moves smoothly and is firmly fixed. The drilling rig frame is sturdy, with a low center of gravity, and has good stability during high-speed drilling.
6. Equipped with sufficient instruments to grasp the situation inside the hole, the control handle is relatively flexible, the layout is reasonable, and the operation is flexible and reliable.
7. The drilling rig and mud pump are driven separately by a single machine, making the airport layout more flexible and reducing the airport area.
Parameter | Specification |
Drilling Depth | 1000m (Φ42mm standard drill pipe)<br>700m (Φ50mm standard drill pipe)<br>1000m (BQ drill pipe)<br>700m (NQ drill pipe) |
Rotation Angle of the Main Shaft | 0~360° |
Dimensions (L×W×H) | 2730×1100×1800mm |
Weight of the Drill (without power unit) | 1720kg |
Parameter | Specification |
Spindle Speed | Low Speed: 97; 178; 255; 370r/min<br>High Speed: 297; 548; 781; 1136r/min |
Reverse Speed | Low Speed: 79r/min<br>High Speed: 242r/min |
Spindle Stroke | 600mm |
Maximum Pull Force of the Spindle | 80kN |
Maximum Push Force of the Spindle | 60kN |
Maximum Torque of the Spindle | 2610N·m |
Spindle Through Hole Diameter | 68mm |
Parameter | Specification |
Maximum Pull Force of Single Rope | 30kN |
Hoisting Speed (Third Layer) | 0.80; 1.48; 2.12; 3.08m/s |
Wire Rope Diameter | 16mm |
Rope Capacity on the Drum | 90m |
Parameter | Specification |
Crawling Cylinder Stroke | 460mm |
Maximum Distance from the Front End of the Drill to the Hole After Crawling | 310mm |
Parameter | Specification |
System Design Pressure | 8MPa |
Gear Pump Displacement | 20ml/r |
Model | Y2-200L-4 Electric Motor<br>ZH4100G43 Diesel Engine<br>R4105G53 Diesel Engine | Power | 30kW<br>31kW<br>42kW |
Speed | 1470r/min<br>1500r/min<br>1500r/min |
Safety regulations for drilling rigs
1. The drilling work site should be kept clean.
2. When installing and dismantling the drilling rig, it is necessary to ensure correctness and completeness without any defects.
3. When lifting the mast of the drilling rig, the operator should stand in a safe position.
4. When starting the electric motor, all friction clutches of the drilling rig should be opened.
5. When the drilling rig is working, it is strictly prohibited to remove the protective cover.
6. Before starting work, the reliability of the braking device, as well as the performance of the friction clutch and starting device, should be checked.
7. Before the electric motor stops, it is prohibited to inspect the drilling rig.
8. It is strictly prohibited to tighten any parts of the drilling rig during operation.
9. When the drilling rig is in operation, refueling is strictly prohibited. The upper pulley of the mast should be refueled when the drilling rig is stopped.
10. It is not allowed to work on the mast before the electric motor stops.
11. In any case, when someone is working on the upper section of the mast, no other personnel are allowed to stay under the mast.
12. In case of severe weather (rainstorm, heavy snow, ice or wind above level 5), [3] it is not allowed to work on the mast. At the same time, it is not allowed to use artificial lighting to work on the mast.
13. It is strictly prohibited to use steel wire ropes with cracked strands.
14. When lifting and lowering drilling tools, it is strictly prohibited to touch the steel wire rope with hands.
15. Except for lifting the drilling rig and drilling pipes, the wellhead is strictly prohibited from being opened.
16. In order to prevent the swinging of drilling tools or extraction tubes when they are taken out of the well, hooks made of steel rods with a diameter of 15-20mm must be used to hook them.
17. When cleaning the suction tube, a sturdy and reliable steel wire rope should be used to form a loop, wrapped around the lower end of the suction tube, and flipped over.
18. When using pulleys to lift or lower casing, as well as during salvage operations, all workers should leave the drilling site.
19. When using a crane to pull out the casing, in order to prevent the casing from falling off, it must be fixed together.
20. When the lighting is stopped (at night), drilling work should be stopped. When the drilling tool is still in the well, it should be carefully removed from the well.
Company Profile:
Hengshui Aoxing Geological Equipment Co., Ltd has over 10 years of market experience and is a manufacturer and supplier of grouting materials and drilling materials in the fields of water conservancy, geology, mining, tunnels, subways, construction, geological exploration, mining exploration, geotechnical engineering, soil investigation, etc.
The main products include: inflatable or water filled packers, manual packers, high-pressure grouting pipes, pneumatic hoses, FULO grouting pipes, sleeve valve grouting pipes, grouting data acquisition instruments, grouting pumps, screw grouting pumps, cement mixers, high-speed grouting machines, mud stations, sprayers, Lurong test packers and Lurong test equipment, diamond drill bits, hole extenders, geological drill rods and casings, exploration drilling rigs, water well drilling rigs, engineering drilling rigs, hydraulic drilling rigs, air compressors, core barrels, salvage barrels, SPT tools, soil sampling tools, drilling tools and accessories, grouting pump accessories and drilling rig accessories, etc.
Our team is dedicated to dam curtain consolidation grouting, foundation engineering grouting, mineral exploration, soil investigation, and geological engineering. Provide solutions for engineering drilling.
We can provide accurate, valuable, and targeted solutions and services to our customers based on their specific requirements and needs.