QHCL80-(1200-1800)-2PLY Corrugated Cardboard Making Line
Item:QHCL-80-1400-2ply Corrugated Cardboard Production Line
- Design speed:80m/min
- Economic speed:60m/min
- Working width:1400mm
Note: The roll paper which is used to test the production speed should meet following requirements:
- Grade: Min. B
- Moisture content:11% ± 1%
- Face paper:150~200g/ m2
- Liner paper:150~200g/ m2
- Corrugated paper: 105~180g/ m2
- Flute profiles: A, B, or according to client`s requirements
- Steam requirements:
- Steam quantity: 1000Kg/Hr Max. pressure: 1.13Mpa
- Normal pressure: 0.98-1.12MPa
- Electricity: 380V 50Hz three-phase, or four phase
- Equipment Direction:Left or Right transmission will be according to client`s requirements.
Note: Customer`s self –provided parts:
- Steam heating system: one set of boiler of 1000Kg/Hr, pressure 0.98-1.13MPa
- Steam pipelines above valves and steam back, water drainage pipelines
- Compressed air pipelines, glue pipelines
- Power, electrical wire to operation box
- Water pipelines, water barrel
- Water, electricity, steam ground foundation
- Raw material ( paper roll, corn starch, caustic soda, sodium borax) to test machinery
- Engine oil, lubricating oil, hydraulic oil, lubricating and high-resisting lubricating
- Installation and commissioning persons accommodation, and person arrangement
Quality Guarantee
- Quality Guarantee period: one year after final acceptance
- Within the period of quality guarantee, the Seller is obliged to supply technical assistance to the Buyer to ensure normal production. Within the period of quality guarantee, in case of any defects or malfunctions, which have been proven to be caused by Seller’s poor materials, designing errors, and poor fabrication and assembly technology, upon receipt of the Buyer’s information in writing, the Seller will send its technicians immediately.
- Within the period of quality guarantee, in case of any defects or malfunctions, which have been proven to be caused by the Buyer using improper material, mis-operating and maintenance, upon receipt of the Buyer’s information in writing, the Seller will send its technicians immediately. The international air tickets (if necessary), local transportation and accommodation will be borne by the buyer.