24-100 point Electronic metrological Milking Parlour Automatic Cow Machine System
Introduction:
Description:
1) The inner pipeline of milking system is thoroughly cleaned
2) Bacterial content be reduced and milk is not easily to go bad.
3) Makes the clean for main pipeline’s inner easily
4) Achieve the purpose of recycling the residual milk attached to the main pipeline.
5) Save water and electricity.
Technical Parameters:
9JTD-2*8 | 9JTD-2*12 | 9JTD-2*16 | 9JTD-2*20 | 9JTD-2*24 | |
Working Vacuum | 50Kpa | 50Kpa | 50Kpa | 50Kpa | 50Kpa |
Pulsation Ratio | 60/40 | 60/40 | 60/40 | 60/40 | 60/40 |
Frequency | 60 ± 3 RPM | 60 ± 3 RPM | 60 ± 3 RPM | 60 ± 3 RPM | 60 ± 3 RPM |
Vacuum pump power | 5.5 KW | 2*4 KW | 2*4 KW | 2*5.5 KW | 2*7.5KW |
Vacuum pump speed | 2100L/min | 2*1200L/min | 2*2100L/min | 2*2100L/min | 2*2800L/min |
Milk pump speed | 8T/h | 20T/h | 20T/h | 20T/h | 20T/h |
Milk pump power | 2.2KW | 4KW | 4KW | 4KW | 4KW |
Note: This is sample, we will match vacuum pump according to your actual situations.
Milking parlor photos show :
1. Vacuum system
2. Electronic milk measuring system
Display: It has many functions such as cow number display, group display, conductivity display, output display and cow special code display.
Alarm: It has alarm function for dry milk, abnormal milking output, abnormal milking time, wrong group, etc.
Milking: automatic cup removal control, pulsation frequency/ratio control. Stimulating massage and forced milking function, for serious errors can be set to prohibit milking function
3. Milk collecting system
4. Quick release canopy frame system :After milking, the cows are released at one time, which saves cow time and improves milking efficiency
5. Full automatic cleaning system: Automatic addition of cold and hot water, automatic ratio of acid and alkali cleaning liquid
6. Pasture management system (if you are interested)
Installation policy:
- After the buyer received the milking parlor, the seller will send two engineers to the buyer’s site to guide installation, adjust the whole system and train labors within 7~10 days.
- The buyer should bear the cost include actual expenses for the visa, round-trip tickets, insurance, accommodation and labor of engineers.
- Tools for installation should be provided by the buyer, the seller will provide detailed tool list.
Our company